AIRLINK 75.50 Increased By ▲ 1.00 (1.34%)
BOP 4.73 No Change ▼ 0.00 (0%)
CNERGY 4.18 Increased By ▲ 0.04 (0.97%)
DFML 40.12 Increased By ▲ 0.77 (1.96%)
DGKC 88.80 Increased By ▲ 3.90 (4.59%)
FCCL 22.99 Increased By ▲ 1.09 (4.98%)
FFBL 30.47 Increased By ▲ 0.26 (0.86%)
FFL 9.23 Decreased By ▼ -0.02 (-0.22%)
GGL 10.14 Decreased By ▼ -0.26 (-2.5%)
HASCOL 6.20 Decreased By ▼ -0.13 (-2.05%)
HBL 106.50 Decreased By ▼ -1.75 (-1.62%)
HUBC 140.10 Decreased By ▼ -0.15 (-0.11%)
HUMNL 10.59 Increased By ▲ 0.29 (2.82%)
KEL 4.77 Decreased By ▼ -0.03 (-0.63%)
KOSM 4.39 Decreased By ▼ -0.03 (-0.68%)
MLCF 38.40 Increased By ▲ 0.90 (2.4%)
OGDC 123.60 Decreased By ▼ -1.04 (-0.83%)
PAEL 24.62 Increased By ▲ 0.18 (0.74%)
PIBTL 6.10 Decreased By ▼ -0.10 (-1.61%)
PPL 114.30 Decreased By ▼ -2.10 (-1.8%)
PRL 24.06 Decreased By ▼ -0.54 (-2.2%)
PTC 13.05 Decreased By ▼ -0.08 (-0.61%)
SEARL 59.60 Increased By ▲ 3.61 (6.45%)
SNGP 61.80 Decreased By ▼ -1.18 (-1.87%)
SSGC 9.66 Decreased By ▼ -0.21 (-2.13%)
TELE 7.85 Decreased By ▼ -0.14 (-1.75%)
TPLP 10.07 Increased By ▲ 0.14 (1.41%)
TRG 65.20 Increased By ▲ 0.70 (1.09%)
UNITY 26.90 Increased By ▲ 0.24 (0.9%)
WTL 1.34 Increased By ▲ 0.02 (1.52%)
BR100 7,701 Decreased By -17 (-0.22%)
BR30 24,706 Decreased By -71.5 (-0.29%)
KSE100 73,754 Decreased By -108.9 (-0.15%)
KSE30 23,617 Decreased By -74.6 (-0.31%)

SSGC's Meter Manufacturing Plant achieved a record production of 750,001 gas meters, two months before the closing of the financial year 2013-14. This remarkable feat of the Meter Plant's management and workers was acknowledged at a ceremony called 'Celebration of Achievement', held at the Plant's premises on Monday in which Zuhair Siddiqui, MD, SSGC was the chief guest.
What was even more outstanding about the achievement was that the rejection rates for both the G-4 and G-1.6 meters were the lowest ever in the meter plant's history. In his address, the MD SSGC reiterated that the Meter Plant has always raised the performance bar through constant business process re-engineering. On the occasion, he announced a 5 percent salary hike of HR and 3rd party workers and Rs 3,000 bonus for the workers of the plant.
Irfan Zafar, Sr General Manager (Operations) applauded the determination and hard work of the facility workers and said that no matter how ambitious the targets are quality of production must never be compromised. Earlier, Saeed Rizvi, GM (Meter Plant) gave a comprehensive overview about the production trend of the Plant for the last 10 years as well as future projections and plans. He said that the total number of components required for assembling G-1.6 and G-4 gas meters are 57 and 49, respectively. Rizvi said that on average 130 seconds are spent on producing a single meter. He further added that the Plant manufactures 2,200 G-4 units and 750 G-1.6 units per day. The GM said that by the end of the current fiscal year, that the target is 880,000 meters while the projection for the FY 2014-15 is 1,000,000 units.
On behalf of the workers, Aslam Rajput, Chairman, PLU (CBA) assured the management of their continued dedication and hard work. Fayyaz Merchant, Sr General Manager (Engineering Services) presented a memento to the MD. Two of the meter plant's personnel presented MD with a chrome model of G-1.6 meter. Earlier, the MD was also briefed on various stages of production, right from the fixing of diaphragm assembly to the underwater leak testing of the unit produced.-PR

Copyright Business Recorder, 2014

Comments

Comments are closed.