AIRLINK 74.00 Decreased By ▼ -0.25 (-0.34%)
BOP 5.14 Increased By ▲ 0.09 (1.78%)
CNERGY 4.55 Increased By ▲ 0.13 (2.94%)
DFML 37.15 Increased By ▲ 1.31 (3.66%)
DGKC 89.90 Increased By ▲ 1.90 (2.16%)
FCCL 22.40 Increased By ▲ 0.20 (0.9%)
FFBL 33.03 Increased By ▲ 0.31 (0.95%)
FFL 9.75 Decreased By ▼ -0.04 (-0.41%)
GGL 10.75 Decreased By ▼ -0.05 (-0.46%)
HBL 115.50 Decreased By ▼ -0.40 (-0.35%)
HUBC 137.10 Increased By ▲ 1.26 (0.93%)
HUMNL 9.95 Increased By ▲ 0.11 (1.12%)
KEL 4.60 Decreased By ▼ -0.01 (-0.22%)
KOSM 4.83 Increased By ▲ 0.17 (3.65%)
MLCF 39.75 Decreased By ▼ -0.13 (-0.33%)
OGDC 138.20 Increased By ▲ 0.30 (0.22%)
PAEL 27.00 Increased By ▲ 0.57 (2.16%)
PIAA 24.24 Decreased By ▼ -2.04 (-7.76%)
PIBTL 6.74 Decreased By ▼ -0.02 (-0.3%)
PPL 123.62 Increased By ▲ 0.72 (0.59%)
PRL 27.40 Increased By ▲ 0.71 (2.66%)
PTC 13.90 Decreased By ▼ -0.10 (-0.71%)
SEARL 61.75 Increased By ▲ 3.05 (5.2%)
SNGP 70.15 Decreased By ▼ -0.25 (-0.36%)
SSGC 10.52 Increased By ▲ 0.16 (1.54%)
TELE 8.57 Increased By ▲ 0.01 (0.12%)
TPLP 11.10 Decreased By ▼ -0.28 (-2.46%)
TRG 64.02 Decreased By ▼ -0.21 (-0.33%)
UNITY 26.76 Increased By ▲ 0.71 (2.73%)
WTL 1.38 No Change ▼ 0.00 (0%)
BR100 7,874 Increased By 36.2 (0.46%)
BR30 25,596 Increased By 136 (0.53%)
KSE100 75,342 Increased By 411.7 (0.55%)
KSE30 24,214 Increased By 68.6 (0.28%)
Business & Finance

Pakistan says finalising details of PSGP project with Russia

  • Energy minister says govt 'moving fast', new terminals to have no take or pay liability
Published October 9, 2021

Minister for Energy Hammad Azhar said on Saturday that the government is "moving fast" on finalising details of the Pakistan-Stream Gas Pipeline (PSGP) project, formerly called the North-South pipeline, with Russian counterparts.

The minister shared the development in a tweet post, saying that the government has facilitated the allocation of pipeline capacity firm offer to two upcoming terminals. “The new terminals will have no take or pay liability on the government like previous terminals and will be based on B2B models,” informed Azhar.

The minister added that these measures will enhance the capability of the system to handle imported gas but in a “cost-efficient manner.”

Pakistan, Russia sign Heads of Terms for $2.5bn PSGP project

Back in July, after days of negotiations, Pakistan and Russia signed Heads of Terms to construct the $2.5 billion Pakistan-Stream Gas Pipeline (PSGP) project of 1,040 kilometers from Port Qasim to Kasur, to be completed by 2023.

The infrastructure of the 42-to-56 diameter pipeline, costing $2.25 -2.5 billion, will ensure the enhanced energy security of Pakistan.

The project will secure sustainable gas supply infrastructure for the next 40 years. This will be the most essential conduit between the installation of new LNG terminals and the industrial growth of Pakistan. Oil and Gas Regulatory Authority (Ogra) will determine the tariff of gas pipelines. The raw material of the pipeline will come from Russia whereas local companies will lay the pipeline.

The Pakistan Stream Gas Pipeline Project was announced in a joint statement of the Pakistan-Russia Inter-Governmental Commission on November 26-28, 2014.

The federal cabinet approved the Protocol to IGA on March 9, 2021. Amended IGA was signed on May 28, 2021, whereas the original IGA was signed on October 16, 2015. According to the IGA, Pakistan-nominated entity, Inter-State Gas System, will undertake the project through GIDC proceeds of (74%) and external equity (26%).

Comments

Comments are closed.