AGL 37.90 Decreased By ▼ -0.04 (-0.11%)
AIRLINK 160.05 Increased By ▲ 4.83 (3.11%)
BOP 8.95 Decreased By ▼ -0.12 (-1.32%)
CNERGY 6.85 Increased By ▲ 0.13 (1.93%)
DCL 10.07 Increased By ▲ 0.54 (5.67%)
DFML 40.15 Decreased By ▼ -0.16 (-0.4%)
DGKC 92.10 Decreased By ▼ -0.85 (-0.91%)
FCCL 38.13 Decreased By ▼ -0.25 (-0.65%)
FFBL 78.35 Decreased By ▼ -0.23 (-0.29%)
FFL 13.45 Decreased By ▼ -0.15 (-1.1%)
HUBC 113.75 Increased By ▲ 3.56 (3.23%)
HUMNL 14.61 Decreased By ▼ -0.28 (-1.88%)
KEL 5.62 Decreased By ▼ -0.11 (-1.92%)
KOSM 8.23 Decreased By ▼ -0.24 (-2.83%)
MLCF 44.90 Decreased By ▼ -0.76 (-1.66%)
NBP 74.80 Decreased By ▼ -1.37 (-1.8%)
OGDC 192.29 Increased By ▲ 0.42 (0.22%)
PAEL 31.69 Increased By ▲ 1.21 (3.97%)
PIBTL 8.72 Increased By ▲ 0.56 (6.86%)
PPL 166.90 Increased By ▲ 0.34 (0.2%)
PRL 31.37 Increased By ▲ 1.93 (6.56%)
PTC 22.08 Increased By ▲ 2.01 (10.01%)
SEARL 97.25 Increased By ▲ 0.63 (0.65%)
TELE 8.48 Increased By ▲ 0.21 (2.54%)
TOMCL 34.90 Increased By ▲ 0.64 (1.87%)
TPLP 11.10 Increased By ▲ 0.88 (8.61%)
TREET 18.56 Increased By ▲ 0.90 (5.1%)
TRG 60.99 Decreased By ▼ -0.26 (-0.42%)
UNITY 32.00 Increased By ▲ 0.03 (0.09%)
WTL 1.53 Increased By ▲ 0.06 (4.08%)
BR100 11,245 Increased By 28.8 (0.26%)
BR30 33,928 Increased By 278 (0.83%)
KSE100 104,834 Increased By 275.4 (0.26%)
KSE30 32,439 Increased By 72.8 (0.22%)
Business & Finance

Pakistan says finalising details of PSGP project with Russia

  • Energy minister says govt 'moving fast', new terminals to have no take or pay liability
Published October 9, 2021

Minister for Energy Hammad Azhar said on Saturday that the government is "moving fast" on finalising details of the Pakistan-Stream Gas Pipeline (PSGP) project, formerly called the North-South pipeline, with Russian counterparts.

The minister shared the development in a tweet post, saying that the government has facilitated the allocation of pipeline capacity firm offer to two upcoming terminals. “The new terminals will have no take or pay liability on the government like previous terminals and will be based on B2B models,” informed Azhar.

The minister added that these measures will enhance the capability of the system to handle imported gas but in a “cost-efficient manner.”

Pakistan, Russia sign Heads of Terms for $2.5bn PSGP project

Back in July, after days of negotiations, Pakistan and Russia signed Heads of Terms to construct the $2.5 billion Pakistan-Stream Gas Pipeline (PSGP) project of 1,040 kilometers from Port Qasim to Kasur, to be completed by 2023.

The infrastructure of the 42-to-56 diameter pipeline, costing $2.25 -2.5 billion, will ensure the enhanced energy security of Pakistan.

The project will secure sustainable gas supply infrastructure for the next 40 years. This will be the most essential conduit between the installation of new LNG terminals and the industrial growth of Pakistan. Oil and Gas Regulatory Authority (Ogra) will determine the tariff of gas pipelines. The raw material of the pipeline will come from Russia whereas local companies will lay the pipeline.

The Pakistan Stream Gas Pipeline Project was announced in a joint statement of the Pakistan-Russia Inter-Governmental Commission on November 26-28, 2014.

The federal cabinet approved the Protocol to IGA on March 9, 2021. Amended IGA was signed on May 28, 2021, whereas the original IGA was signed on October 16, 2015. According to the IGA, Pakistan-nominated entity, Inter-State Gas System, will undertake the project through GIDC proceeds of (74%) and external equity (26%).

Comments

Comments are closed.