AGL 40.40 Increased By ▲ 0.20 (0.5%)
AIRLINK 129.25 Increased By ▲ 0.14 (0.11%)
BOP 6.81 Increased By ▲ 0.21 (3.18%)
CNERGY 4.13 Increased By ▲ 0.10 (2.48%)
DCL 8.73 Increased By ▲ 0.28 (3.31%)
DFML 41.40 Increased By ▲ 0.15 (0.36%)
DGKC 87.75 Increased By ▲ 0.75 (0.86%)
FCCL 33.85 Increased By ▲ 0.50 (1.5%)
FFBL 66.40 Increased By ▲ 0.50 (0.76%)
FFL 10.69 Increased By ▲ 0.15 (1.42%)
HUBC 113.51 Increased By ▲ 2.81 (2.54%)
HUMNL 15.65 Increased By ▲ 0.42 (2.76%)
KEL 4.87 Increased By ▲ 0.09 (1.88%)
KOSM 7.62 Decreased By ▼ -0.21 (-2.68%)
MLCF 43.10 Increased By ▲ 1.20 (2.86%)
NBP 61.50 Increased By ▲ 1.00 (1.65%)
OGDC 192.20 Increased By ▲ 9.40 (5.14%)
PAEL 27.05 Increased By ▲ 1.69 (6.66%)
PIBTL 7.26 Increased By ▲ 1.00 (15.97%)
PPL 150.50 Increased By ▲ 2.69 (1.82%)
PRL 24.96 Increased By ▲ 0.40 (1.63%)
PTC 16.25 Increased By ▲ 0.01 (0.06%)
SEARL 71.30 Increased By ▲ 0.80 (1.13%)
TELE 7.25 Decreased By ▼ -0.05 (-0.68%)
TOMCL 36.29 Decreased By ▼ -0.01 (-0.03%)
TPLP 8.05 Increased By ▲ 0.20 (2.55%)
TREET 16.30 Increased By ▲ 1.00 (6.54%)
TRG 51.56 Decreased By ▼ -0.14 (-0.27%)
UNITY 27.35 No Change ▼ 0.00 (0%)
WTL 1.27 Increased By ▲ 0.04 (3.25%)
BR100 9,957 Increased By 115.5 (1.17%)
BR30 30,770 Increased By 733.6 (2.44%)
KSE100 93,292 Increased By 771.2 (0.83%)
KSE30 29,017 Increased By 230.5 (0.8%)

LAHORE: Lahore Development Authority (LDA) Vice Chairman Sheikh Muahmmad Imran has said that the Sheeranwala Gate Flyover project (costing Rs 4.9 billion) is the most important of all the ongoing projects in the city which will benefit more than 120,000 vehicles daily.

“The project is being constructed in a densely populated and important commercial centre of the city, so its importance is high,” he said during his visit to the project site here on Friday. Member LDA governing body Engineer Amir Riaz Qureshi, Project Director Akbar Hussain, and other concerned officers of LDA, Nespak, and WASA were also present on the occasion.

He also said that traffic will have a signal-free route and the flyover will benefit Circular Road, Masti Gate, Badami Bagh, Railway Station and all adjoining areas.

As the monsoon rains approach the city next week, the Vice Chairman asked the relevant officials to take measures keeping this in mind and added that citizens should be least disturbed by the ongoing work on the project.

On the occasion, LDA Chief Engineer Mazhar Hussain Khan told the Vice Chairman that 30 pile foundations have been laid so far; three to four piles are laid on daily basis. “Six feet sidewalks will also be constructed on both the sides of the road,” he added.

Copyright Business Recorder, 2021

Comments

Comments are closed.