AIRLINK 75.29 Increased By ▲ 0.79 (1.06%)
BOP 4.69 Decreased By ▼ -0.04 (-0.85%)
CNERGY 4.13 Decreased By ▼ -0.01 (-0.24%)
DFML 39.69 Increased By ▲ 0.34 (0.86%)
DGKC 86.69 Increased By ▲ 1.79 (2.11%)
FCCL 22.20 Increased By ▲ 0.30 (1.37%)
FFBL 30.30 Increased By ▲ 0.09 (0.3%)
FFL 9.26 Increased By ▲ 0.01 (0.11%)
GGL 10.21 Decreased By ▼ -0.19 (-1.83%)
HASCOL 6.20 Decreased By ▼ -0.13 (-2.05%)
HBL 107.30 Decreased By ▼ -0.95 (-0.88%)
HUBC 139.00 Decreased By ▼ -1.25 (-0.89%)
HUMNL 10.52 Increased By ▲ 0.22 (2.14%)
KEL 4.81 Increased By ▲ 0.01 (0.21%)
KOSM 4.48 Increased By ▲ 0.06 (1.36%)
MLCF 37.94 Increased By ▲ 0.44 (1.17%)
OGDC 124.39 Decreased By ▼ -0.25 (-0.2%)
PAEL 24.60 Increased By ▲ 0.16 (0.65%)
PIBTL 6.25 Increased By ▲ 0.05 (0.81%)
PPL 115.20 Decreased By ▼ -1.20 (-1.03%)
PRL 24.30 Decreased By ▼ -0.30 (-1.22%)
PTC 12.98 Decreased By ▼ -0.15 (-1.14%)
SEARL 59.50 Increased By ▲ 3.51 (6.27%)
SNGP 62.40 Decreased By ▼ -0.58 (-0.92%)
SSGC 9.65 Decreased By ▼ -0.22 (-2.23%)
TELE 7.78 Decreased By ▼ -0.21 (-2.63%)
TPLP 10.00 Increased By ▲ 0.07 (0.7%)
TRG 64.64 Increased By ▲ 0.14 (0.22%)
UNITY 26.77 Increased By ▲ 0.11 (0.41%)
WTL 1.31 Decreased By ▼ -0.01 (-0.76%)
BR100 7,680 Decreased By -37.7 (-0.49%)
BR30 24,617 Decreased By -161.1 (-0.65%)
KSE100 73,670 Decreased By -193.3 (-0.26%)
KSE30 23,610 Decreased By -81.1 (-0.34%)
Pakistan

Power shortfall jumps to 3,569 MW

ISLAMABAD : The electricity shortfall in the country on Saturday again jumped to 3,569 MW from 2,443 MW as the total pow
Published August 20, 2011

 ISLAMABAD: The electricity shortfall in the country on Saturday again jumped to 3,569 MW from 2,443 MW as the total power generation was recorded as 14,911 MW against the demand of 18,480 MW during the last 24 hours.

According to a briefing on daily power generation and load-management position, the hydel generation stood at 6,107 MW, WAPDA thermal 1,817 MW, IPPs 6,107 MW and rental 154 MW.

As many as 680 MW was supplied to Karachi Electric Supply Company (KESC), the report added.

Water level at Tarbela and Mangla dams was recorded as 1538.68 feet and 1202.10 feet with water discharge of 80,000 and 13,000 cusecs respectively.

The hydel generation witnessed significantly increase and stood at 6,107 MW owing to increase water inflow in rivers.

 

Copyright APP (Associated Press of Pakistan), 2011

 

Comments

Comments are closed.