BR100 Increased By (0.14%)
BR30 Decreased By (-0.19%)
KSE100 Increased By (0.12%)
KSE30 Increased By (0.09%)
AGHA 7.79 Increased By ▲ 0.04 (0.52%)
BECO 5.23 Increased By ▲ 0.04 (0.77%)
BML 57.26 Decreased By ▼ -1.40 (-2.39%)
BOP 34.10 Increased By ▲ 0.41 (1.22%)
CNERGY 9.92 Decreased By ▼ -0.69 (-6.5%)
CSIL 5.35 Increased By ▲ 0.05 (0.94%)
FCCL 54.61 Increased By ▲ 0.87 (1.62%)
FFL 16.70 Increased By ▲ 0.24 (1.46%)
FNEL 1.24 Increased By ▲ 0.02 (1.64%)
KEL 7.42 Increased By ▲ 0.14 (1.92%)
KOSM 5.75 Increased By ▲ 0.11 (1.95%)
LOTCHEM 29.35 Decreased By ▼ -0.30 (-1.01%)
MLCF 94.35 Decreased By ▼ -2.01 (-2.09%)
NBP 202.70 Decreased By ▼ -0.83 (-0.41%)
NCPL 57.00 Increased By ▲ 0.15 (0.26%)
NPL 67.78 Increased By ▲ 0.47 (0.7%)
OGDC 316.40 Decreased By ▼ -1.82 (-0.57%)
PACE 10.64 Increased By ▲ 0.01 (0.09%)
PAEL 43.15 Increased By ▲ 1.38 (3.3%)
PIBTL 16.72 Decreased By ▼ -0.09 (-0.54%)
PPL 220.50 Increased By ▲ 0.33 (0.15%)
PRL 49.05 No Change ▼ 0.00 (0%)
PTC 70.98 Increased By ▲ 0.97 (1.39%)
SSGC 28.17 Decreased By ▼ -0.97 (-3.33%)
TBL 9.90 Increased By ▲ 0.13 (1.33%)
TELE 8.80 Decreased By ▼ -0.02 (-0.23%)
TPL 18.14 Increased By ▲ 0.97 (5.65%)
TPLP 13.40 Increased By ▲ 0.89 (7.11%)
TREET 22.75 Increased By ▲ 0.16 (0.71%)
TRG 60.30 Increased By ▲ 0.08 (0.13%)
By

LAHORE: Prime Minister Shehbaz Sharif on Sunday directed speedy completion of solar and wind energy projects. While chairing a meeting on renewable energy here, he said it was a priority of the government to encourage the production of electricity through solar and wind energy sources.

The renewable sources would produce low-cost and environment-friendly electricity, he added.

The prime minister pointed out that the last government did not complete the solar and wind energy projects started by the previous government of Pakistan Muslim League-Nawaz (PML-N). The 220 million people of Pakistan suffered due to the criminal negligence and incompetence of the last government, he added.

The PM said work on the solar power projects of 10,000 megawatts was continuing at a fast pace.

The solar power projects would help in saving precious foreign exchange being spent on the import of expensive fuel, he remarked.

Shifting to renewable sources key to Pakistan’s energy security: PM Shehbaz

He said the relevant institutions should immediately present a strategy for fully benefiting from the available solar and wind resources in the country.

He assured that all obstacles in the way of renewable energy projects would be removed.

The participants of the meeting were informed in detail about the present wind and solar energy resources in the country, the pace of work on the ongoing projects, and the delayed projects.

Besides the current 10,000 megawatts renewal energy projects, it was told that solar and wind power projects of 6,000 megawatts were also considered to produce environment-friendly and low-cost energy. The federal ministers Ishaq Dar, Khurram Dastgir, Ahsan Iqbal, Special Assistant to PM Jehanzeb Khan, Adviser Ahad Cheema and officials concerned attended the meeting.

Comments

Comments are closed for this article.

Muhammad Zarar Feb 16, 2023 08:17am
I suggest to take action for the micro grid as well to provide this facility at lower cost to rural population and up lifting their green economic status.
0