AIRLINK 72.59 Increased By ▲ 3.39 (4.9%)
BOP 4.99 Increased By ▲ 0.09 (1.84%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.71 Increased By ▲ 0.46 (1.47%)
DGKC 80.90 Increased By ▲ 3.65 (4.72%)
FCCL 21.42 Increased By ▲ 1.42 (7.1%)
FFBL 35.19 Increased By ▲ 0.19 (0.54%)
FFL 9.33 Increased By ▲ 0.21 (2.3%)
GGL 9.82 Increased By ▲ 0.02 (0.2%)
HBL 112.40 Decreased By ▼ -0.36 (-0.32%)
HUBC 136.50 Increased By ▲ 3.46 (2.6%)
HUMNL 7.14 Increased By ▲ 0.19 (2.73%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.67 Increased By ▲ 1.07 (2.92%)
OGDC 137.75 Increased By ▲ 4.88 (3.67%)
PAEL 23.41 Increased By ▲ 0.77 (3.4%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.63 Increased By ▲ 0.17 (2.63%)
PPL 125.05 Increased By ▲ 8.75 (7.52%)
PRL 26.99 Increased By ▲ 1.09 (4.21%)
PTC 13.32 Increased By ▲ 0.24 (1.83%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 70.80 Increased By ▲ 3.20 (4.73%)
SSGC 10.54 No Change ▼ 0.00 (0%)
TELE 8.33 Increased By ▲ 0.05 (0.6%)
TPLP 10.95 Increased By ▲ 0.15 (1.39%)
TRG 60.60 Increased By ▲ 1.31 (2.21%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,566 Increased By 157.7 (2.13%)
BR30 24,786 Increased By 749.4 (3.12%)
KSE100 71,902 Increased By 1235.2 (1.75%)
KSE30 23,595 Increased By 371 (1.6%)

FAISALABAD: On the special directives of Chief Executive Officer (CEO) Faisalabad Electric Supply Company (FESCO) Engr. Bashir Ahmad, annual maintenance program and tree trimming has been started on HT/LT lines in all five operation circles in FESCO jurisdiction including First, Second, Jhang, Sargodha, Mianwali and Jhang. The basic aim of this campaign is to ensure uninterrupted power supply to consumers.

In a letter issued by Chief Engineer Operations Nazar Muhammad Dub, special directions have been issued to the line staff to carry out full patrolling of at all 11KV feeders immediately to identify the location and nature of defect on the lines and informed him about the required necessary materials to remove the fault.

Special teams formed under the annual maintenance program of FESCO would set the jumpers of 11KV line, PG connectors, X-arms and D-sets, arrange the replacement of disc and pin insulators, tree trimming along the lines and will correct hotspots during night patrolling in Faisalabad, Jhang, Mianwali, Sargodha and Jhang circles. In addition, kites and flaxes hanging on 11KV-lines will also be removed. CEO FESCO Engr. Bashir Ahmad will personally monitor the whole process.

Copyright Business Recorder, 2022

Comments

Comments are closed.