AIRLINK 74.00 Decreased By ▼ -0.25 (-0.34%)
BOP 5.14 Increased By ▲ 0.09 (1.78%)
CNERGY 4.55 Increased By ▲ 0.13 (2.94%)
DFML 37.15 Increased By ▲ 1.31 (3.66%)
DGKC 89.90 Increased By ▲ 1.90 (2.16%)
FCCL 22.40 Increased By ▲ 0.20 (0.9%)
FFBL 33.03 Increased By ▲ 0.31 (0.95%)
FFL 9.75 Decreased By ▼ -0.04 (-0.41%)
GGL 10.75 Decreased By ▼ -0.05 (-0.46%)
HBL 115.50 Decreased By ▼ -0.40 (-0.35%)
HUBC 137.10 Increased By ▲ 1.26 (0.93%)
HUMNL 9.95 Increased By ▲ 0.11 (1.12%)
KEL 4.60 Decreased By ▼ -0.01 (-0.22%)
KOSM 4.83 Increased By ▲ 0.17 (3.65%)
MLCF 39.75 Decreased By ▼ -0.13 (-0.33%)
OGDC 138.20 Increased By ▲ 0.30 (0.22%)
PAEL 27.00 Increased By ▲ 0.57 (2.16%)
PIAA 24.24 Decreased By ▼ -2.04 (-7.76%)
PIBTL 6.74 Decreased By ▼ -0.02 (-0.3%)
PPL 123.62 Increased By ▲ 0.72 (0.59%)
PRL 27.40 Increased By ▲ 0.71 (2.66%)
PTC 13.90 Decreased By ▼ -0.10 (-0.71%)
SEARL 61.75 Increased By ▲ 3.05 (5.2%)
SNGP 70.15 Decreased By ▼ -0.25 (-0.36%)
SSGC 10.52 Increased By ▲ 0.16 (1.54%)
TELE 8.57 Increased By ▲ 0.01 (0.12%)
TPLP 11.10 Decreased By ▼ -0.28 (-2.46%)
TRG 64.02 Decreased By ▼ -0.21 (-0.33%)
UNITY 26.76 Increased By ▲ 0.71 (2.73%)
WTL 1.38 No Change ▼ 0.00 (0%)
BR100 7,874 Increased By 36.2 (0.46%)
BR30 25,596 Increased By 136 (0.53%)
KSE100 75,342 Increased By 411.7 (0.55%)
KSE30 24,214 Increased By 68.6 (0.28%)

KARACHI: Hub district administration imposed ban on removing sand and gravel from the bed of river at the Hub Bridge on Sunday.

The district administration has notified constitution of a task force to halt removal of sand and gravel from the bed of Hub River.

The task force comprises of five members including the SHO, according to a notification.

The National Highway Authority (NHA) had wrote a letter to Deputy Commissioner Hub seeking ban on removal of sand and gravel from the river in one kilometre area of the bridge to save the bridge structure from further damage.

"Illegal digging of sand and gravel from the place posing serious threat to Hub bridge," according to NHA letter.

"The tractor mafia stealing sand and gravel from the place at large-scale," the NHA said.

Illegal digging for sand and gravel at the river has exposed the piles of the bridge, the NHA said.

"The contractors in construction business removing sand and gravel on daily basis and with it land surface at the place going down one foot each year."

The National Highway Authority (NHA) on Saturday declared the bridge over Hub River connecting Karachi as safe for travelling after footages shared on social media highlighted its dilapidated condition.

Clarifying the matter, the NHA said that the 530-metre long bridge at Hub River was built 50 years back and has a strong structure without any technical faults.

Director NHA Kashif Ali Shaikh said that illegal digging for reti and bajri at the river exposed the piles of the bridge and were later strengthened using RCC and steel jacketing in 2017-18. "The structures are now safe after the repair works," he said.

He said that although the recent rains and flood in the river caused damage to the outer walls of the bridge constructed by the NHA, however, its inner structure is intact.

The NHA official said that they would carry out the repair works at the damaged outer wall of the bridge to further strengthen the piles, in order to save it from any major flooding in future.

Comments

Comments are closed.