AIRLINK 75.50 Increased By ▲ 1.00 (1.34%)
BOP 4.73 No Change ▼ 0.00 (0%)
CNERGY 4.18 Increased By ▲ 0.04 (0.97%)
DFML 40.12 Increased By ▲ 0.77 (1.96%)
DGKC 88.80 Increased By ▲ 3.90 (4.59%)
FCCL 22.99 Increased By ▲ 1.09 (4.98%)
FFBL 30.47 Increased By ▲ 0.26 (0.86%)
FFL 9.23 Decreased By ▼ -0.02 (-0.22%)
GGL 10.14 Decreased By ▼ -0.26 (-2.5%)
HASCOL 6.20 Decreased By ▼ -0.13 (-2.05%)
HBL 106.50 Decreased By ▼ -1.75 (-1.62%)
HUBC 140.10 Decreased By ▼ -0.15 (-0.11%)
HUMNL 10.59 Increased By ▲ 0.29 (2.82%)
KEL 4.77 Decreased By ▼ -0.03 (-0.63%)
KOSM 4.39 Decreased By ▼ -0.03 (-0.68%)
MLCF 38.40 Increased By ▲ 0.90 (2.4%)
OGDC 123.60 Decreased By ▼ -1.04 (-0.83%)
PAEL 24.62 Increased By ▲ 0.18 (0.74%)
PIBTL 6.10 Decreased By ▼ -0.10 (-1.61%)
PPL 114.30 Decreased By ▼ -2.10 (-1.8%)
PRL 24.06 Decreased By ▼ -0.54 (-2.2%)
PTC 13.05 Decreased By ▼ -0.08 (-0.61%)
SEARL 59.60 Increased By ▲ 3.61 (6.45%)
SNGP 61.80 Decreased By ▼ -1.18 (-1.87%)
SSGC 9.66 Decreased By ▼ -0.21 (-2.13%)
TELE 7.85 Decreased By ▼ -0.14 (-1.75%)
TPLP 10.07 Increased By ▲ 0.14 (1.41%)
TRG 65.20 Increased By ▲ 0.70 (1.09%)
UNITY 26.90 Increased By ▲ 0.24 (0.9%)
WTL 1.34 Increased By ▲ 0.02 (1.52%)
BR100 7,694 Decreased By -23.6 (-0.31%)
BR30 24,691 Decreased By -86.7 (-0.35%)
KSE100 73,754 Decreased By -108.9 (-0.15%)
KSE30 23,617 Decreased By -74.6 (-0.31%)

imageQUETTA: Chief Minster Balochistan, Dr Abdul Malik Baloch said on Thursday that the case of Reko Deq was in the International Court and no progress in this connection would be made unless the parliamentarians are taken on board.

Talking to media here at Balochistan Assembly, he said that his government would only carry out development project, which were in the favour of the people of the province.

About his recent visit to China, he said that he had signed MoU with the chinese companies regarding the Kashghar to Gawadar Corridor.

"We are working out the planning on laying out rail and road network connecting Balochistan with the China, Dr Malik added.

To a question, CM said that federal government has been asked to complete the Dera Ghazi Khan-Loralai and Dado-Khuzdar transmission lines at earliest. Completion of these transmission lines would bring 600 to 700 mega watt of electricity in the system removing loadshedding from the province, he maintained.

Comments

Comments are closed.