AIRLINK 75.50 Increased By ▲ 1.00 (1.34%)
BOP 4.73 No Change ▼ 0.00 (0%)
CNERGY 4.18 Increased By ▲ 0.04 (0.97%)
DFML 40.12 Increased By ▲ 0.77 (1.96%)
DGKC 88.80 Increased By ▲ 3.90 (4.59%)
FCCL 22.99 Increased By ▲ 1.09 (4.98%)
FFBL 30.47 Increased By ▲ 0.26 (0.86%)
FFL 9.23 Decreased By ▼ -0.02 (-0.22%)
GGL 10.14 Decreased By ▼ -0.26 (-2.5%)
HASCOL 6.20 Decreased By ▼ -0.13 (-2.05%)
HBL 106.50 Decreased By ▼ -1.75 (-1.62%)
HUBC 140.10 Decreased By ▼ -0.15 (-0.11%)
HUMNL 10.59 Increased By ▲ 0.29 (2.82%)
KEL 4.77 Decreased By ▼ -0.03 (-0.63%)
KOSM 4.39 Decreased By ▼ -0.03 (-0.68%)
MLCF 38.40 Increased By ▲ 0.90 (2.4%)
OGDC 123.60 Decreased By ▼ -1.04 (-0.83%)
PAEL 24.62 Increased By ▲ 0.18 (0.74%)
PIBTL 6.10 Decreased By ▼ -0.10 (-1.61%)
PPL 114.30 Decreased By ▼ -2.10 (-1.8%)
PRL 24.06 Decreased By ▼ -0.54 (-2.2%)
PTC 13.05 Decreased By ▼ -0.08 (-0.61%)
SEARL 59.60 Increased By ▲ 3.61 (6.45%)
SNGP 61.80 Decreased By ▼ -1.18 (-1.87%)
SSGC 9.66 Decreased By ▼ -0.21 (-2.13%)
TELE 7.85 Decreased By ▼ -0.14 (-1.75%)
TPLP 10.07 Increased By ▲ 0.14 (1.41%)
TRG 65.20 Increased By ▲ 0.70 (1.09%)
UNITY 26.90 Increased By ▲ 0.24 (0.9%)
WTL 1.34 Increased By ▲ 0.02 (1.52%)
BR100 7,694 Decreased By -23.6 (-0.31%)
BR30 24,691 Decreased By -86.7 (-0.35%)
KSE100 73,754 Decreased By -108.9 (-0.15%)
KSE30 23,617 Decreased By -74.6 (-0.31%)

SSGC strongly denies a misleading statement that has been communicated by K-Electric to the media stating that the shortage of gas supply has impacted its power generation, leading to temporary load shedding in many areas of Karachi.
SSGC would like to bring on record that gas supply to K-Electric has not been reduced rather the gas utility is providing additional 10-15 mmcfd of natural gas to KE. Against KE's demand of 190 mmcfd, SSGC is providing 210 mmcfd gas on a monthly average basis to the power company, only in the best interest of Karachites who are experiencing scorching heat nowadays.
SSGC also rejects the baseless claim of KE for supplying low pressure gas to the power utility as it is supplying gas with full pressure to all four power plants of KE. To Bin Qasim Power Plant SSGC is supplying 140 mmcfd at 104 psi, to Korangi Creek Power Plant commonly known as Combine Cycle Plant, SSGC is providing 26 mmcfd gas at 55 psi, to Korangi Industrial Area Power Plant SSGC is supplying 12 mmcfd gas at 35 psi whereas to the SITE Area Sher Shah Power Plant SSGC is providing 14 mmcfd gas at 30 psi.-PR

Copyright Business Recorder, 2019

Comments

Comments are closed.