BR100 Decreased By (-1.08%)
BR30 Decreased By (-1.23%)
KSE100 Decreased By (-0.85%)
KSE30 Decreased By (-1.61%)
AGHA 6.11 Decreased By ▼ -0.07 (-1.13%)
BECO 4.12 Decreased By ▼ -0.11 (-2.6%)
BML 61.59 Decreased By ▼ -0.25 (-0.4%)
BOP 30.94 Decreased By ▼ -0.76 (-2.4%)
CNERGY 12.10 Increased By ▲ 0.04 (0.33%)
CSIL 5.65 Increased By ▲ 0.02 (0.36%)
FCCL 58.05 Decreased By ▼ -0.66 (-1.12%)
FFL 13.35 Decreased By ▼ -0.12 (-0.89%)
FNEL 1.16 Decreased By ▼ -0.01 (-0.85%)
KEL 6.11 Decreased By ▼ -0.03 (-0.49%)
KOSM 5.61 Decreased By ▼ -0.05 (-0.88%)
LOTCHEM 24.43 Decreased By ▼ -0.39 (-1.57%)
MLCF 100.04 Decreased By ▼ -2.05 (-2.01%)
NBP 175.92 Decreased By ▼ -3.74 (-2.08%)
NCPL 51.73 Increased By ▲ 1.68 (3.36%)
NPL 53.95 Increased By ▲ 1.05 (1.98%)
OGDC 312.89 Decreased By ▼ -3.35 (-1.06%)
PACE 9.22 Increased By ▲ 0.01 (0.11%)
PAEL 33.48 Decreased By ▼ -0.54 (-1.59%)
PIBTL 13.19 Decreased By ▼ -0.23 (-1.71%)
PPL 217.96 Decreased By ▼ -3.34 (-1.51%)
PRL 85.55 Increased By ▲ 0.95 (1.12%)
PTC 47.64 Decreased By ▼ -0.74 (-1.53%)
SSGC 22.60 Decreased By ▼ -0.34 (-1.48%)
TBL 9.16 Decreased By ▼ -0.14 (-1.51%)
TELE 7.15 Increased By ▲ 0.08 (1.13%)
TPL 25.48 Decreased By ▼ -0.38 (-1.47%)
TPLP 13.36 Increased By ▲ 0.25 (1.91%)
TREET 24.56 Decreased By ▼ -0.43 (-1.72%)
TRG 53.41 Decreased By ▼ -0.62 (-1.15%)

ISLAMABAD: K-Electric has secured approval from the National Electric Power Regulatory Authority (NEPRA) for its Power Acquisition Programme (PAP) for the period FY 2024-2028. This approval represents a pivotal development in KE’s strategy to enhance the reliability and sustainability of power supply in Karachi.

The KE’s submission of the PAP on March 20, 2023, outlined a comprehensive plan to ensure a stable power supply by integrating renewable energy, local fuel, and power off-take from the National Grid. This ambitious programme aligns with the NEPRA approved IGCEP 2022-2031, National Electricity Policy 2021 and the National Electricity Plan 2023-2027.

A significant focus of the approved plan is the integration of renewable energy. KE aims to add 1,282 MW of renewable energy, including solar and wind projects, by 2030. This includes a notable 270 MW solar PV project in Karachi and a 200 MW hybrid plant near the Dhabeji Grid Station. These projects are expected to significantly contribute to the city’s energy mix, promoting sustainability and reducing the carbon footprint.

Investment and loss reduction: KE’s 7-year plan approved by Nepra

Moonis Alvi, CEO of K-Electric, expressed his appreciation for NEPRA’s decision, stating, “We welcome the decision by NEPRA on our Power Acquisition Program, providing us a clear roadmap for the next 5 years. Integrating clean energy is vital to driving a sustainable energy ecosystem, balancing affordability with reliability. Over the past few months, we have been garnering a great deal of global interest on our 640 MW renewable energy projects, which indicate the repute that KE enjoys as a brand. This decision enables us to invest in innovative, sustainable technologies, ultimately contributing to the betterment of Karachi and ensuring a brighter future for its residents.”

Additionally, the PAP includes capacity addition on local coal which will diversify the energy mix and reduce reliance on imported fuels.

The PAP also details KE’s agreements to import additional power from the National Grid which will also improve grid utilization, benefitting the regulated consumers as well as the sector at large.

This approval marks a significant milestone for KE as it endeavors to meet the growing energy needs of Karachi while promoting sustainability through increased reliance on renewable energy sources. The successful implementation of this plan is expected to drive the city’s economic growth and provide a reliable and sustainable power supply to its residents and businesses.

Copyright Business Recorder, 2024

Comments

Comments are closed for this article.