BR100 Decreased By (-0.25%)
BR30 Decreased By (-0.64%)
KSE100 Decreased By (-0.41%)
KSE30 Decreased By (-0.67%)
BECO 5.83 Decreased By ▼ -0.20 (-3.32%)
BML 57.90 Increased By ▲ 5.15 (9.76%)
BOP 33.79 Decreased By ▼ -0.46 (-1.34%)
CNERGY 8.15 Decreased By ▼ -0.01 (-0.12%)
DCL 11.79 Decreased By ▼ -0.55 (-4.46%)
FCCL 53.49 Decreased By ▼ -0.40 (-0.74%)
FCSC 5.40 Increased By ▲ 0.18 (3.45%)
FFL 17.84 Decreased By ▼ -0.19 (-1.05%)
FNEL 1.30 No Change ▼ 0.00 (0%)
HUMNL 11.11 Increased By ▲ 0.11 (1%)
KEL 8.02 Decreased By ▼ -0.09 (-1.11%)
KOSM 5.45 Increased By ▲ 0.07 (1.3%)
MLCF 87.40 Decreased By ▼ -0.65 (-0.74%)
NBP 184.24 Decreased By ▼ -2.24 (-1.2%)
PACE 11.62 Increased By ▲ 0.90 (8.4%)
PAEL 40.25 Increased By ▲ 0.31 (0.78%)
PIAHCLA 26.12 Decreased By ▼ -0.05 (-0.19%)
PIBTL 17.14 Decreased By ▼ -0.18 (-1.04%)
PPL 228.73 Decreased By ▼ -4.05 (-1.74%)
PRL 34.49 Decreased By ▼ -0.46 (-1.32%)
PTC 67.54 Decreased By ▼ -0.02 (-0.03%)
SEARL 90.93 No Change ▼ 0.00 (0%)
SSGC 26.83 Decreased By ▼ -0.34 (-1.25%)
TELE 8.53 Decreased By ▼ -0.04 (-0.47%)
THCCL 66.14 Increased By ▲ 6.01 (10%)
TPLP 9.33 Increased By ▲ 0.57 (6.51%)
TREET 24.51 Decreased By ▼ -0.03 (-0.12%)
TRG 71.61 Decreased By ▼ -0.14 (-0.2%)
WAVES 10.98 Increased By ▲ 1.00 (10.02%)
WTL 1.28 Increased By ▲ 0.02 (1.59%)
By

BERLIN: Mercedes-Benz laid out on Wednesday an over 1 billion-euro ($1.06 billion) plan to adapt its global production network for electric power train systems - including battery assembly, electric drive units, and axles - from 2024.

Plants in Kamenz and Untertuerkheim in Germany as well as Beijing, which already assemble batteries for electric and hybrid models, will assemble batteries for models on the upcoming MMA and MB.EA platforms, with another battery assembly site in Koelleda pending support from regional government.

Untertuerkheim, Beijing and Sebes in Romania will build electric drive units for cars on the new platforms, with Hamburg and Untertuerkheim to remain the lead plants for assembling electric axles and components.

“There is no site that is not included,” production chief Joerg Burzer said on a press call.

Management and employee representatives reached an agreement in June on shifting European car plants towards EVs, making Sindelfingen the home for high-end vehicles on the AMG.EA platform, Bremen and Kecskemet in Hungary for core luxury models and Rastatt and Kecskemet for entry-level vehicles.

Mercedes-Benz Vans to reorganise production network in Europe

The carmaker has set up its car plants to produce both combustion engine and electric cars on single production lines, but assembling batteries and motors on the same line is more complex, Burzer said.

Still, many of the component-making plants will carry on making parts for combustion engine cars for as long as there is demand, as the premium carmaker works towards all-electric sales by 2030 “where market conditions allow”.

Comments

Comments are closed for this article.