BR100 Increased By (0.11%)
BR30 Decreased By (-0.26%)
KSE100 Increased By (0.12%)
KSE30 Increased By (0.09%)
AGHA 7.79 Increased By ▲ 0.04 (0.52%)
BECO 5.23 Increased By ▲ 0.04 (0.77%)
BML 57.26 Decreased By ▼ -1.40 (-2.39%)
BOP 34.10 Increased By ▲ 0.41 (1.22%)
CNERGY 9.92 Decreased By ▼ -0.69 (-6.5%)
CSIL 5.35 Increased By ▲ 0.05 (0.94%)
FCCL 54.61 Increased By ▲ 0.87 (1.62%)
FFL 16.70 Increased By ▲ 0.24 (1.46%)
FNEL 1.24 Increased By ▲ 0.02 (1.64%)
KEL 7.42 Increased By ▲ 0.14 (1.92%)
KOSM 5.75 Increased By ▲ 0.11 (1.95%)
LOTCHEM 29.35 Decreased By ▼ -0.30 (-1.01%)
MLCF 94.35 Decreased By ▼ -2.01 (-2.09%)
NBP 202.70 Decreased By ▼ -0.83 (-0.41%)
NCPL 57.00 Increased By ▲ 0.15 (0.26%)
NPL 67.78 Increased By ▲ 0.47 (0.7%)
OGDC 316.40 Decreased By ▼ -1.82 (-0.57%)
PACE 10.64 Increased By ▲ 0.01 (0.09%)
PAEL 43.15 Increased By ▲ 1.38 (3.3%)
PIBTL 16.72 Decreased By ▼ -0.09 (-0.54%)
PPL 220.50 Increased By ▲ 0.33 (0.15%)
PRL 49.05 No Change ▼ 0.00 (0%)
PTC 70.98 Increased By ▲ 0.97 (1.39%)
SSGC 28.17 Decreased By ▼ -0.97 (-3.33%)
TBL 9.90 Increased By ▲ 0.13 (1.33%)
TELE 8.80 Decreased By ▼ -0.02 (-0.23%)
TPL 18.14 Increased By ▲ 0.97 (5.65%)
TPLP 13.40 Increased By ▲ 0.89 (7.11%)
TREET 22.75 Increased By ▲ 0.16 (0.71%)
TRG 60.30 Increased By ▲ 0.08 (0.13%)

LAHORE: The Punjab Provincial Development Working Party approved thirteen development schemes of various sectors with an estimated cost of Rs. 36,517.44 million.

These schemes were approved in the 23rd meeting of Provincial Development Working Party (PDWP) of current fiscal year 2022-23 presided over the Chairman Planning & Development Board Abdullah Khan Sumbal.

The approved development schemes included Strengthening of Muhammad Nawaz Sharif University of Agriculture, Multan at the cost of Rs. 650 million, Rehabilitation of Road from Chunian to Habib Abad Lahore Multan Road, Length=19.95 Km, District Kasur (Revised) at the cost of Rs. 449.621 million, Widening / Improvement of Jhang Sahiwal Sargodha Road in District Sargodha at the cost of Rs. 2,180.206 million, Rehabilitation / Reconstruction of Road from Faisalabad Road to Lahore Road along with Canal Bank Length 28.47 Km in District Sargodha at the cost of Rs. 1,179.868 million, Widening / Improvement / Reconstruction of Road from Millat Road Chak No. 115/JB to 62/JB via 114/JB, 113/JB, 111/JB, 112/JB, 1/JB 46/JB, 47/JB, 50/JB Baba Bakala, 56/JB, 60/JB Length-55 Km, District Faisalabad at the cost of Rs. 911.852 million, Construction of Dual Carriageway from Sheikh Fazal to Chichawatni, Length-24.15 Km, Sahiwal at the cost of Rs. 4,555.787 million, Improvement of Energy Efficiency in WASA Systems at the cost of Rs. 495.000 million, Feasibility Study for Solarization of Courts and District Session Courts of Punjab (PC-II) at the cost of Rs. 10.000 million, Improvement of Bus Stops, Sahiwal at the cost of Rs. 110.109 million, High Street Livable Model Road, Arra Tullah Road Livable Model Road, Pedestrian & Cycling Track, Sahiwal at the cost of Rs. 1,639.831 million, Grade Separator at Railway crossing at Shahabpur Road, Sialkot at the cost of Rs. 2,105.57 million, Signals and Junctions Improvement at Sialkot at the cost of Rs. 1,483.40 million and Construction of Parking Sheds for Solid Waste Machinery in Sahiwal and Sialkot City (2nd Revised) at the cost of Rs. 507.406 million.

Copyright Business Recorder, 2022

Comments

Comments are closed for this article.