AIRLINK 78.39 Increased By ▲ 5.39 (7.38%)
BOP 5.34 Decreased By ▼ -0.01 (-0.19%)
CNERGY 4.33 Increased By ▲ 0.02 (0.46%)
DFML 30.87 Increased By ▲ 2.32 (8.13%)
DGKC 78.51 Increased By ▲ 4.22 (5.68%)
FCCL 20.58 Increased By ▲ 0.23 (1.13%)
FFBL 32.30 Increased By ▲ 1.40 (4.53%)
FFL 10.22 Increased By ▲ 0.16 (1.59%)
GGL 10.29 Decreased By ▼ -0.10 (-0.96%)
HBL 118.50 Increased By ▲ 2.53 (2.18%)
HUBC 135.10 Increased By ▲ 2.90 (2.19%)
HUMNL 6.87 Increased By ▲ 0.19 (2.84%)
KEL 4.17 Increased By ▲ 0.14 (3.47%)
KOSM 4.73 Increased By ▲ 0.13 (2.83%)
MLCF 38.67 Increased By ▲ 0.13 (0.34%)
OGDC 134.85 Increased By ▲ 1.00 (0.75%)
PAEL 23.40 Decreased By ▼ -0.43 (-1.8%)
PIAA 26.64 Decreased By ▼ -0.49 (-1.81%)
PIBTL 7.02 Increased By ▲ 0.26 (3.85%)
PPL 113.45 Increased By ▲ 0.65 (0.58%)
PRL 27.73 Decreased By ▼ -0.43 (-1.53%)
PTC 14.60 Decreased By ▼ -0.29 (-1.95%)
SEARL 56.50 Increased By ▲ 0.08 (0.14%)
SNGP 66.30 Increased By ▲ 0.50 (0.76%)
SSGC 10.94 Decreased By ▼ -0.07 (-0.64%)
TELE 9.15 Increased By ▲ 0.13 (1.44%)
TPLP 11.67 Decreased By ▼ -0.23 (-1.93%)
TRG 71.43 Increased By ▲ 2.33 (3.37%)
UNITY 24.51 Increased By ▲ 0.80 (3.37%)
WTL 1.33 No Change ▼ 0.00 (0%)
BR100 7,493 Increased By 58.6 (0.79%)
BR30 24,558 Increased By 338.4 (1.4%)
KSE100 72,052 Increased By 692.5 (0.97%)
KSE30 23,808 Increased By 241 (1.02%)

ISLAMABAD: Federal Minister for Water Resources Syed Khurshid Ahmad Shah on Sunday said that timely completion of under-construction water projects was the top most priority of the government.

He said the country could face the worst water crisis in case of failure to meet the prescribed time limit.

In a statement, he said that Diamer Bhasha Dam, Dasu Dam, Tha Kot Dam, and Patan Dam were vital to overcoming the energy crisis in the country adding that the prudent utilization of water resources are imperative for the country.

The Federal Minister said that the country could not tolerate a moment’s delay or negligence in the construction of these reservoirs, it was a matter of national integrity. “We have been here for a year, but in the meantime, we will work on a war footing,” he added. The Federal Minister directed the concerned agencies to make immediate feasibility of the tunnel to be constructed on Diamer Bhasha Dam.

Diamer Bhasha Dam would have a live storage capacity of 6.4 MAF. The dam is being constructed on river Indus – 40 km downstream of Chilas town. The installed capacity of the dam is 4500 MW of cheap power.

Dasu Hydro Power Project is a vital project that would trigger a new era of socio-economic development in the country and stabilize Pakistan’s economy by providing low-cost hydel electricity to the masses.

Similarly, the Thakot hydropower project will have a capacity of 4,000 MW and produce annual energy of 21,300 GWh for the national grid.

Patan hydropower project’s Powerhouse is situated on the left bank near Patan Village, and 305 km from Islamabad. It has installed capacity of 2400mw.

Comments

Comments are closed.