AGL 24.24 Increased By ▲ 0.77 (3.28%)
AIRLINK 107.70 Increased By ▲ 1.59 (1.5%)
BOP 5.12 Decreased By ▼ -0.05 (-0.97%)
CNERGY 3.63 Decreased By ▼ -0.03 (-0.82%)
DCL 7.32 Decreased By ▼ -0.48 (-6.15%)
DFML 42.10 Decreased By ▼ -2.09 (-4.73%)
DGKC 88.80 Increased By ▲ 0.30 (0.34%)
FCCL 21.75 No Change ▼ 0.00 (0%)
FFBL 41.85 Decreased By ▼ -0.67 (-1.58%)
FFL 8.61 Decreased By ▼ -0.14 (-1.6%)
HUBC 148.75 Increased By ▲ 0.95 (0.64%)
HUMNL 10.14 Decreased By ▼ -0.11 (-1.07%)
KEL 4.28 Decreased By ▼ -0.06 (-1.38%)
KOSM 3.59 Decreased By ▼ -0.20 (-5.28%)
MLCF 36.20 Decreased By ▼ -0.20 (-0.55%)
NBP 47.75 Decreased By ▼ -1.55 (-3.14%)
OGDC 129.10 Decreased By ▼ -1.75 (-1.34%)
PAEL 25.75 Decreased By ▼ -0.20 (-0.77%)
PIBTL 6.00 Decreased By ▼ -0.05 (-0.83%)
PPL 113.65 Decreased By ▼ -0.90 (-0.79%)
PRL 22.30 Decreased By ▼ -0.30 (-1.33%)
PTC 12.10 Decreased By ▼ -0.27 (-2.18%)
SEARL 54.98 Decreased By ▼ -0.72 (-1.29%)
TELE 7.11 Decreased By ▼ -0.14 (-1.93%)
TOMCL 37.11 Increased By ▲ 0.71 (1.95%)
TPLP 7.76 Decreased By ▼ -0.19 (-2.39%)
TREET 15.00 Decreased By ▼ -0.29 (-1.9%)
TRG 55.54 Decreased By ▼ -1.16 (-2.05%)
UNITY 31.20 Decreased By ▼ -0.65 (-2.04%)
WTL 1.15 Decreased By ▼ -0.02 (-1.71%)
BR100 8,248 Decreased By -46.7 (-0.56%)
BR30 25,878 Decreased By -223.8 (-0.86%)
KSE100 78,030 Decreased By -439.8 (-0.56%)
KSE30 25,084 Decreased By -114.2 (-0.45%)

ISLAMABAD: A 300 megawatts coal-fired Gwadar Power Plant would start functioning from October 2023, said official sources. The power plant would cater the needs of some 150,000 people of Gwadar by the end of 2023 under the 2050 Master Plan of Gwadar.

The power plant of independent power producer, is one of the key energy projects on the China Pakistan Economic Corridor (CPEC). The project aimed at improving reliability on local power supply would help gradually solving the problems in current economic development and urban construction in Gwadar region being restricted by the shortage of power.

"We are currently spending millions of dollars per annum to generate electricity from diesel generators. I hope the plant would be operationalise soon to solve the port's power scarcity issues. The power plant is of great significance to deepening the energy cooperation between China and Pakistan, boosting the development of the Belt and Road Initiative, improving the overall power structure of Balochistan, and promoting local economic development in Gwadar Port.

All major projects under CPEC in Gwadar, including Gwadar Power Plant, the New Gwadar International Airport Project, the China Pak Friendship Hospital, China-Pak Technical and Vocational Institute in Gwadar, the Gwadar East-bay Expressway Project, Gwadar Free Zone, and Gwadar Port would become a shining pearl in the region.

Comments

Comments are closed.