AIRLINK 80.60 Increased By ▲ 1.19 (1.5%)
BOP 5.26 Decreased By ▼ -0.07 (-1.31%)
CNERGY 4.52 Increased By ▲ 0.14 (3.2%)
DFML 34.50 Increased By ▲ 1.31 (3.95%)
DGKC 78.90 Increased By ▲ 2.03 (2.64%)
FCCL 20.85 Increased By ▲ 0.32 (1.56%)
FFBL 33.78 Increased By ▲ 2.38 (7.58%)
FFL 9.70 Decreased By ▼ -0.15 (-1.52%)
GGL 10.11 Decreased By ▼ -0.14 (-1.37%)
HBL 117.85 Decreased By ▼ -0.08 (-0.07%)
HUBC 137.80 Increased By ▲ 3.70 (2.76%)
HUMNL 7.05 Increased By ▲ 0.05 (0.71%)
KEL 4.59 Decreased By ▼ -0.08 (-1.71%)
KOSM 4.56 Decreased By ▼ -0.18 (-3.8%)
MLCF 37.80 Increased By ▲ 0.36 (0.96%)
OGDC 137.20 Increased By ▲ 0.50 (0.37%)
PAEL 22.80 Decreased By ▼ -0.35 (-1.51%)
PIAA 26.57 Increased By ▲ 0.02 (0.08%)
PIBTL 6.76 Decreased By ▼ -0.24 (-3.43%)
PPL 114.30 Increased By ▲ 0.55 (0.48%)
PRL 27.33 Decreased By ▼ -0.19 (-0.69%)
PTC 14.59 Decreased By ▼ -0.16 (-1.08%)
SEARL 57.00 Decreased By ▼ -0.20 (-0.35%)
SNGP 66.75 Decreased By ▼ -0.75 (-1.11%)
SSGC 11.00 Decreased By ▼ -0.09 (-0.81%)
TELE 9.11 Decreased By ▼ -0.12 (-1.3%)
TPLP 11.46 Decreased By ▼ -0.10 (-0.87%)
TRG 70.23 Decreased By ▼ -1.87 (-2.59%)
UNITY 25.20 Increased By ▲ 0.38 (1.53%)
WTL 1.33 Decreased By ▼ -0.07 (-5%)
BR100 7,626 Increased By 100.3 (1.33%)
BR30 24,814 Increased By 164.5 (0.67%)
KSE100 72,743 Increased By 771.4 (1.07%)
KSE30 24,034 Increased By 284.8 (1.2%)
Markets

High-voltage power line linking France to Britain starts at full capacity

  • With a capacity of 1 gigawatt, the direct current power cable, called Interconnexion France-Angleterre 2 (IFA-2).
  • Wholesale power traders started buying capacity on Thursday to transport power across the 149-mile subsea power cable.
Published January 22, 2021

LONDON: A new high-voltage power line between France and Britain has started to flow at full capacity, Britain's National Grid said on Friday.

With a capacity of 1 gigawatt, the direct current power cable, called Interconnexion France-Angleterre 2 (IFA-2), can provide enough energy to power 1 million British homes and is expected to meet 1.2% of Britain's electricity demand.

Wholesale power traders started buying capacity on Thursday to transport power across the 149-mile subsea power cable, National Grid said.

The line was initially scheduled to start transmission tests in the third quarter of 2020 and go live shortly after.

National Grid has four operational interconnectors - two to France (IFA and IFA2), one to the Netherlands (BritNed) and one to Belgium (Nemo Link).

Two more projects are under construction, one to Norway which will be operational this year and one to Denmark, which will come into operation in 2023.

Comments

Comments are closed.