AIRLINK 72.59 Increased By ▲ 3.39 (4.9%)
BOP 4.99 Increased By ▲ 0.09 (1.84%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.71 Increased By ▲ 0.46 (1.47%)
DGKC 80.90 Increased By ▲ 3.65 (4.72%)
FCCL 21.42 Increased By ▲ 1.42 (7.1%)
FFBL 35.19 Increased By ▲ 0.19 (0.54%)
FFL 9.33 Increased By ▲ 0.21 (2.3%)
GGL 9.82 Increased By ▲ 0.02 (0.2%)
HBL 112.40 Decreased By ▼ -0.36 (-0.32%)
HUBC 136.50 Increased By ▲ 3.46 (2.6%)
HUMNL 7.14 Increased By ▲ 0.19 (2.73%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.67 Increased By ▲ 1.07 (2.92%)
OGDC 137.75 Increased By ▲ 4.88 (3.67%)
PAEL 23.41 Increased By ▲ 0.77 (3.4%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.63 Increased By ▲ 0.17 (2.63%)
PPL 125.05 Increased By ▲ 8.75 (7.52%)
PRL 26.99 Increased By ▲ 1.09 (4.21%)
PTC 13.32 Increased By ▲ 0.24 (1.83%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 70.80 Increased By ▲ 3.20 (4.73%)
SSGC 10.54 No Change ▼ 0.00 (0%)
TELE 8.33 Increased By ▲ 0.05 (0.6%)
TPLP 10.95 Increased By ▲ 0.15 (1.39%)
TRG 60.60 Increased By ▲ 1.31 (2.21%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,566 Increased By 157.7 (2.13%)
BR30 24,786 Increased By 749.4 (3.12%)
KSE100 71,902 Increased By 1235.2 (1.75%)
KSE30 23,595 Increased By 371 (1.6%)
Technology

NASA test of mega Moon rocket engines cut short

  • The following Artemis II mission in 2023 will take astronauts around the Moon but will not land. Artemis III will send astronauts, including the first woman, to the Moon in 2024.
Published January 17, 2021

WASHINGTON: NASA conducted a test firing of the engines for its giant Space Launch System (SLS) lunar rocket on Saturday but they shut down earlier than planned, the space agency said.

The "hot-fire" test at the Stennis Space Center in Mississippi was supposed to last a little over eight minutes -- the time the engines would burn in flight -- but they shut down just over a minute into the burn.

"Teams are assessing the data to determine what caused the early shutdown, and will determine a path forward," NASA said in a statement.

The SLS rocket is intended to launch the Artemis missions that will take US astronauts back to the Moon.

Despite being cut short, NASA said the test of the RS-25 engines had provided valuable information for the planned missions.

"Saturday's test was an important step forward to ensure that the core stage of the SLS rocket is ready for the Artemis I mission, and to carry crew on future missions," said NASA administrator Jim Bridenstine. "Although the engines did not fire for the full duration, the team successfully worked through the countdown, ignited the engines, and gained valuable data to inform our path forward."

It is not yet known what caused the early shutdown but SLS program manager John Honeycutt told reporters they had seen a flash in a thermal protection blanket on one of the engines and were analyzing the data.

"In my opinion the team accomplished a lot today, we learned a lot about the vehicle," Honeycutt said.

NASA's Artemis I mission to test the SLS and an unmanned Orion spacecraft is scheduled to take place before the end of 2021.

The following Artemis II mission in 2023 will take astronauts around the Moon but will not land. Artemis III will send astronauts, including the first woman, to the Moon in 2024.

In its configuration for Artemis I, the SLS will stand 322 feet (98 meters), taller than the Statue of Liberty, and is more powerful than the Saturn V rockets used in the Apollo missions that sent the first astronauts to the Moon.

NASA's eventual goal is to establish an Artemis Base Camp on the Moon before the end of the decade, an ambitious plan that would require tens of billions of dollar of funding and the green light from President-elect Joe Biden and Congress.

A manned return to the Moon is the first part of the Artemis program to set up a long-term colony and test technologies for a crewed mission to Mars in the 2030s.

Comments

Comments are closed.