AIRLINK 72.59 Increased By ▲ 3.39 (4.9%)
BOP 4.99 Increased By ▲ 0.09 (1.84%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.71 Increased By ▲ 0.46 (1.47%)
DGKC 80.90 Increased By ▲ 3.65 (4.72%)
FCCL 21.42 Increased By ▲ 1.42 (7.1%)
FFBL 35.19 Increased By ▲ 0.19 (0.54%)
FFL 9.33 Increased By ▲ 0.21 (2.3%)
GGL 9.82 Increased By ▲ 0.02 (0.2%)
HBL 112.40 Decreased By ▼ -0.36 (-0.32%)
HUBC 136.50 Increased By ▲ 3.46 (2.6%)
HUMNL 7.14 Increased By ▲ 0.19 (2.73%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.67 Increased By ▲ 1.07 (2.92%)
OGDC 137.75 Increased By ▲ 4.88 (3.67%)
PAEL 23.41 Increased By ▲ 0.77 (3.4%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.63 Increased By ▲ 0.17 (2.63%)
PPL 125.05 Increased By ▲ 8.75 (7.52%)
PRL 26.99 Increased By ▲ 1.09 (4.21%)
PTC 13.32 Increased By ▲ 0.24 (1.83%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 70.80 Increased By ▲ 3.20 (4.73%)
SSGC 10.54 No Change ▼ 0.00 (0%)
TELE 8.33 Increased By ▲ 0.05 (0.6%)
TPLP 10.95 Increased By ▲ 0.15 (1.39%)
TRG 60.60 Increased By ▲ 1.31 (2.21%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,566 Increased By 157.7 (2.13%)
BR30 24,786 Increased By 749.4 (3.12%)
KSE100 71,902 Increased By 1235.2 (1.75%)
KSE30 23,595 Increased By 371 (1.6%)

LAHORE: As the construction activities on strategically important Diamer Basha Dam Project are picking up pace, the Pakistan Water and Power Development Authority (WAPDA) has also commenced the process for providing thousands of jobs to the people of Diamer and Gilgit Baltistan for poverty alleviation in the area and socio-economic uplift of the local populace.

WAPDA advertised as many as 124 vacancies ranging from Basic Pay Scale (BPS) 6 to 16, against which only the people belonging to District Diamer, Gilgit Baltistan will be recruited. Earlier, WAPDA also advertised 179 vacancies of BPS 14 to 20 and some 317 vacancies for security personnel. The eligible candidates hailing from the project area and Gilgit Baltistan will be given priority against these vacancies as well, since progress of the locals is amongst the foremost priorities of WAPDA.

Besides providing employment to the locals on priority, a sum of Rs.78.5 billion is also being spent for resettlement and Confidence Building Measures (CBMs) leading towards socio-economic development in the area. As many as 44 development schemes have been started for improving the existing water supply, irrigation, and health and education infrastructures.

Construction of Chilas Cadet College under the CBMs is nearing completion which will help provide quality education to the local students. In addition, Thak Hydropower Project of 3 MW is also about to be completed to meet the electricity requirements of the area. It is worth mentioning here that Diamer Basha Dam, a vital project for water, food and energy security of Pakistan, is being constructed on River Indus, 315 kilometres upstream of Tarbela Dam, 180 km downstream of Gilgit, and 40 km downstream of Chilas town.

Diamer Basha Dam with gross water storage capacity of 8.1 million acre feet (MAF) and power generation capacity of 4500 Mega Watt (MW) will go a long way in stabilizing the economy. The project will also prove to be instrumental in developing the human resources and creating employment opportunities in the country.

Copyright Business Recorder, 2020

Comments

Comments are closed.