AIRLINK 72.59 Increased By ▲ 3.39 (4.9%)
BOP 4.99 Increased By ▲ 0.09 (1.84%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.71 Increased By ▲ 0.46 (1.47%)
DGKC 80.90 Increased By ▲ 3.65 (4.72%)
FCCL 21.42 Increased By ▲ 1.42 (7.1%)
FFBL 35.19 Increased By ▲ 0.19 (0.54%)
FFL 9.33 Increased By ▲ 0.21 (2.3%)
GGL 9.82 Increased By ▲ 0.02 (0.2%)
HBL 112.40 Decreased By ▼ -0.36 (-0.32%)
HUBC 136.50 Increased By ▲ 3.46 (2.6%)
HUMNL 7.14 Increased By ▲ 0.19 (2.73%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.67 Increased By ▲ 1.07 (2.92%)
OGDC 137.75 Increased By ▲ 4.88 (3.67%)
PAEL 23.41 Increased By ▲ 0.77 (3.4%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.63 Increased By ▲ 0.17 (2.63%)
PPL 125.05 Increased By ▲ 8.75 (7.52%)
PRL 26.99 Increased By ▲ 1.09 (4.21%)
PTC 13.32 Increased By ▲ 0.24 (1.83%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 70.80 Increased By ▲ 3.20 (4.73%)
SSGC 10.54 No Change ▼ 0.00 (0%)
TELE 8.33 Increased By ▲ 0.05 (0.6%)
TPLP 10.95 Increased By ▲ 0.15 (1.39%)
TRG 60.60 Increased By ▲ 1.31 (2.21%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,566 Increased By 157.7 (2.13%)
BR30 24,786 Increased By 749.4 (3.12%)
KSE100 71,902 Increased By 1235.2 (1.75%)
KSE30 23,595 Increased By 371 (1.6%)

ISLAMABAD: Oil & Gas Development Company Limited (OGDCL) being operator of Thal D&P.L with 100 percent working interest has started commercial production of gas from its exploratory wells Thal East-1 and Bhambhra-1, located in district Sukkur (Sindh).

The OGDCL indigenously completed 6" inch dia, 7.5 km flow line from Bhambra Well # 1 to Thal East well # 1 and 8" inch dia, 28.8 km flow line from Thal East well # 1 to Thal West Well # 1. The 8" dia, 12 km flow line from Thal West Well # 1 to Kadanwari Plant was already completed in June, 2019 and well was injected into the system at that time. On June 26th, 2020, the first gas of Thal East well # 1 was injected into the system whereas on June 28th, 2020 the first gas of Bhambhra well # 1 was also injected into the system. The gas is being processed at Kadanwari Plant for onward transmission to M/s SSGCL network. OGDCL is committed to provide 10 MMSCFD gas from Thal East # 1 well and 2.25 MMSCFD gas from Bhambhra well # 1.

The start-up of commercial production would increase the gas production of the Company and of the country thus helping in mitigating ever growing demand of domestic consumers and industry.

Earlier, the joint venture of Baratai D&P.L comprising OGDCL as Operator (97.5%) & Khyber Pakhtunkhwa Oil & Gas Company Limited (KPOGCL) (2.5%) has started commercial production of Gas and Condensate from its exploratory well Dhok Hussain # 01, which is located in district Kohat, Khyber Pakhtunkhwa Province.

The Early Production Facilities which includes installation of well head facility, gathering & separation facility, dehydration plant, pumping facility, storage tanks, filling gantry, gas metering and infrastructure development was completed through indigenous efforts of OGDCL. The laying of 8" inch dia, 14.25 Km flow line from Dhok Hussain Gas Field to M/s SNGPL sales metering station (SMS) was completed by SNGPL. On June 28th, 2020, the first gas was successfully injected into M/s SNGPL network wherein OGDCL is committed to provide 300 BPD Oil and 12 MMSCFD gas.

Copyright Business Recorder, 2020

Comments

Comments are closed.