AIRLINK 72.59 Increased By ▲ 3.39 (4.9%)
BOP 4.99 Increased By ▲ 0.09 (1.84%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.71 Increased By ▲ 0.46 (1.47%)
DGKC 80.90 Increased By ▲ 3.65 (4.72%)
FCCL 21.42 Increased By ▲ 1.42 (7.1%)
FFBL 35.19 Increased By ▲ 0.19 (0.54%)
FFL 9.33 Increased By ▲ 0.21 (2.3%)
GGL 9.82 Increased By ▲ 0.02 (0.2%)
HBL 112.40 Decreased By ▼ -0.36 (-0.32%)
HUBC 136.50 Increased By ▲ 3.46 (2.6%)
HUMNL 7.14 Increased By ▲ 0.19 (2.73%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.67 Increased By ▲ 1.07 (2.92%)
OGDC 137.75 Increased By ▲ 4.88 (3.67%)
PAEL 23.41 Increased By ▲ 0.77 (3.4%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.63 Increased By ▲ 0.17 (2.63%)
PPL 125.05 Increased By ▲ 8.75 (7.52%)
PRL 26.99 Increased By ▲ 1.09 (4.21%)
PTC 13.32 Increased By ▲ 0.24 (1.83%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 70.80 Increased By ▲ 3.20 (4.73%)
SSGC 10.54 No Change ▼ 0.00 (0%)
TELE 8.33 Increased By ▲ 0.05 (0.6%)
TPLP 10.95 Increased By ▲ 0.15 (1.39%)
TRG 60.60 Increased By ▲ 1.31 (2.21%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,566 Increased By 157.7 (2.13%)
BR30 24,786 Increased By 749.4 (3.12%)
KSE100 71,902 Increased By 1235.2 (1.75%)
KSE30 23,595 Increased By 371 (1.6%)

TARBELA: Prime Minister Shahid Khaqan Abbasi Saturday inaugurated 1410 MW Tarbela 4th extension hydropower project. President Azad Jammu & Kashmir Sardar Masood Khan, Governor Khyber Pakhtunkhwa Iqbal Zafar Jhagra, Minister for Water Resources Syed Javed Ali Shah, Minister of State for Information Maryum Aurangzeb and Chinese Ambassador Yao Jing accompanied the Prime Minister.

First unit of 470 MW will be commissioned today, while as two more units each with equal power generating capacity will be online before the advent of summer this year. Commissioning of Tarbela 4th Extension Hydropower Project is yet another historic milestone, achieved by the government to add 1410 MW in the national grid.

The T-4 project will play a pivotal role in balancing energy mix of the country and stabilizing prices of electricity for a long span in future with an attractive economic rate of return of more than 30pc and annual cost sale of US$: 300 million to national exchequer. Completion of this important project within time and cost always held top priority of the government.

It resounds as a real proof of the Government's commitment to provide relief to common man through provision of affordable and clean energy. It will also augment economic growth and social uplift.

Tarbela Dam is located on the Indus River about 100 km northwest of Islamabad. The T-4 project is located within premises of existing Tarbela Dam Project.

Tarbela Dam Project, completed in 1976, has provision of 5 tunnels, 4 on Left Bank and 01 on Right Bank. Tunnels 1-3 have installed capacity of 3,478 MW with average annual energy generation of 15-16 billion units. The T-4 project will generate 3.84 billion units annually, equivalent of burning of 1 million ton of furnace oil. Newly installed units of T-4 project are more efficient and it is expected to have 10 -15% more energy through these units.

Copyright APP (Associated Press of Pakistan), 2018

Comments

Comments are closed.