AGL 34.48 Decreased By ▼ -0.72 (-2.05%)
AIRLINK 132.50 Increased By ▲ 9.27 (7.52%)
BOP 5.16 Increased By ▲ 0.12 (2.38%)
CNERGY 3.83 Decreased By ▼ -0.08 (-2.05%)
DCL 8.10 Decreased By ▼ -0.05 (-0.61%)
DFML 45.30 Increased By ▲ 1.08 (2.44%)
DGKC 75.90 Increased By ▲ 1.55 (2.08%)
FCCL 24.85 Increased By ▲ 0.38 (1.55%)
FFBL 44.18 Decreased By ▼ -4.02 (-8.34%)
FFL 8.80 Increased By ▲ 0.02 (0.23%)
HUBC 144.00 Decreased By ▼ -1.85 (-1.27%)
HUMNL 10.52 Decreased By ▼ -0.33 (-3.04%)
KEL 4.00 No Change ▼ 0.00 (0%)
KOSM 7.74 Decreased By ▼ -0.26 (-3.25%)
MLCF 33.25 Increased By ▲ 0.45 (1.37%)
NBP 56.50 Decreased By ▼ -0.65 (-1.14%)
OGDC 141.00 Decreased By ▼ -4.35 (-2.99%)
PAEL 25.70 Decreased By ▼ -0.05 (-0.19%)
PIBTL 5.74 Decreased By ▼ -0.02 (-0.35%)
PPL 112.74 Decreased By ▼ -4.06 (-3.48%)
PRL 24.08 Increased By ▲ 0.08 (0.33%)
PTC 11.19 Increased By ▲ 0.14 (1.27%)
SEARL 58.50 Increased By ▲ 0.09 (0.15%)
TELE 7.42 Decreased By ▼ -0.07 (-0.93%)
TOMCL 41.00 Decreased By ▼ -0.10 (-0.24%)
TPLP 8.23 Decreased By ▼ -0.08 (-0.96%)
TREET 15.14 Decreased By ▼ -0.06 (-0.39%)
TRG 56.10 Increased By ▲ 0.90 (1.63%)
UNITY 27.70 Decreased By ▼ -0.15 (-0.54%)
WTL 1.31 Decreased By ▼ -0.03 (-2.24%)
BR100 8,605 Increased By 33.2 (0.39%)
BR30 26,904 Decreased By -371.6 (-1.36%)
KSE100 82,074 Increased By 615.2 (0.76%)
KSE30 26,034 Increased By 234.5 (0.91%)

arevaqwPRAGUE: Czech state-run power company CEZ said Friday it had ruled France's Areva out of a tender to build two new units at its Temelin nuclear power facility in southern Czech Republic.

 

Areva "failed to meet legal requirements to build the two units... and other defined criteria," CEZ spokesman Ladislav Kriz said in a statement.

 

"CEZ has precisely and in detail specified the reasons of Areva's elimination" to the company, he added, saying the reasons were both commercial and legal.

 

The verdict leaves groupings led by US giant Westinghouse and Russia's Atomstroiexport alone in bidding for the contract worth an estimated 200-300 billion koruna (8-12 billion euros, $10.5-15.7 billion).

 

With bids placed in July this year, the winner of the tender is to be announced at the end of 2013. The two units are due to be completed by 2025.

 

The extra capacity will raise the share of nuclear energy in the Czech energy mix to about 50 percent from the current 30 percent produced by Temelin and another CEZ-operated nuclear plant in the southern village of Dukovany.

 

Temelin, about 120 kilometres (75 miles) south of Prague, but only about 60 kilometres from the Austrian border, has been heavily criticised by Vienna which has repeatedly raised safety concerns.

 

It may also become a thorn in the side of Germany, which has vowed to shut down its nuclear reactors by 2022.

 

The Czech government, which owns two-thirds of CEZ, is betting on nuclear power as its communist-era coal-fired plants are likely facing closure amid tighter regulations on greenhouse gas emissions.

 

Planned in the communist era and launched in 2000, the existing Temelin facility includes two Russian-type VVER pressurised-water reactors, each with an output of 1,000 megawatts.

Copyright AFP (Agence France-Presse), 2012

Comments

Comments are closed.