AIRLINK 72.59 Increased By ▲ 3.39 (4.9%)
BOP 4.99 Increased By ▲ 0.09 (1.84%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.71 Increased By ▲ 0.46 (1.47%)
DGKC 80.90 Increased By ▲ 3.65 (4.72%)
FCCL 21.42 Increased By ▲ 1.42 (7.1%)
FFBL 35.19 Increased By ▲ 0.19 (0.54%)
FFL 9.33 Increased By ▲ 0.21 (2.3%)
GGL 9.82 Increased By ▲ 0.02 (0.2%)
HBL 112.40 Decreased By ▼ -0.36 (-0.32%)
HUBC 136.50 Increased By ▲ 3.46 (2.6%)
HUMNL 7.14 Increased By ▲ 0.19 (2.73%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.67 Increased By ▲ 1.07 (2.92%)
OGDC 137.75 Increased By ▲ 4.88 (3.67%)
PAEL 23.41 Increased By ▲ 0.77 (3.4%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.63 Increased By ▲ 0.17 (2.63%)
PPL 125.05 Increased By ▲ 8.75 (7.52%)
PRL 26.99 Increased By ▲ 1.09 (4.21%)
PTC 13.32 Increased By ▲ 0.24 (1.83%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 70.80 Increased By ▲ 3.20 (4.73%)
SSGC 10.54 No Change ▼ 0.00 (0%)
TELE 8.33 Increased By ▲ 0.05 (0.6%)
TPLP 10.95 Increased By ▲ 0.15 (1.39%)
TRG 60.60 Increased By ▲ 1.31 (2.21%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,546 Increased By 137.4 (1.85%)
BR30 24,809 Increased By 772.4 (3.21%)
KSE100 71,902 Increased By 1235.2 (1.75%)
KSE30 23,595 Increased By 371 (1.6%)
Top News

Renewable power projects: SBP enhances capacity limit

RECORDER REPORT KARACHI: The State Bank of Pakistan (SBP) has enhanced the capacity limit of all renewable power proj
Published July 31, 2012

SBP2 400RECORDER REPORT

KARACHI: The State Bank of Pakistan (SBP) has enhanced the capacity limit of all renewable power projects from 10MW to 20MW for financing under the ‘Scheme for Financing Power Plants Using Renewable Energy.’

Banks/Development Finance Institutions (DFIs) can consider financing requests of the sponsors, who intend to set up Power Projects up to a maximum capacity of 20MW, using all types of renewable energy sources eligible under the Scheme, says IH&SMEFD Circular Letter No.11, issued to the Presidents/CEOs of all banks/DFIs on Monday.

The maximum financing limit to a single renewable power project under the Scheme has also been fixed at Rs 3 billion to accommodate larger number of borrowers. However, banks/DFIs may continue to provide financing facilities as per their credit policies over and above the maximum limit from their own sources subject to adherence to the Prudential Regulations, the Circular Letter added.

SBP has taken these steps to promote power plants using Renewable Energy in the country after receipt of feedback from the Alternative Energy Development Board (AEDB).

Comments

Comments are closed.