AIRLINK 76.15 Increased By ▲ 1.75 (2.35%)
BOP 4.86 Decreased By ▼ -0.09 (-1.82%)
CNERGY 4.31 Decreased By ▼ -0.03 (-0.69%)
DFML 46.65 Increased By ▲ 1.92 (4.29%)
DGKC 89.25 Increased By ▲ 1.98 (2.27%)
FCCL 23.48 Increased By ▲ 0.58 (2.53%)
FFBL 33.36 Increased By ▲ 1.71 (5.4%)
FFL 9.35 Decreased By ▼ -0.01 (-0.11%)
GGL 10.10 No Change ▼ 0.00 (0%)
HASCOL 6.66 Decreased By ▼ -0.11 (-1.62%)
HBL 113.77 Increased By ▲ 0.17 (0.15%)
HUBC 143.90 Increased By ▲ 3.75 (2.68%)
HUMNL 11.85 Decreased By ▼ -0.06 (-0.5%)
KEL 4.99 Increased By ▲ 0.12 (2.46%)
KOSM 4.40 No Change ▼ 0.00 (0%)
MLCF 38.50 Increased By ▲ 0.10 (0.26%)
OGDC 133.70 Increased By ▲ 0.90 (0.68%)
PAEL 25.39 Increased By ▲ 0.94 (3.84%)
PIBTL 6.75 Increased By ▲ 0.22 (3.37%)
PPL 120.01 Increased By ▲ 0.37 (0.31%)
PRL 26.16 Increased By ▲ 0.28 (1.08%)
PTC 13.89 Increased By ▲ 0.14 (1.02%)
SEARL 57.50 Increased By ▲ 0.25 (0.44%)
SNGP 66.30 Decreased By ▼ -0.10 (-0.15%)
SSGC 10.10 Decreased By ▼ -0.05 (-0.49%)
TELE 8.10 Increased By ▲ 0.15 (1.89%)
TPLP 10.61 Decreased By ▼ -0.03 (-0.28%)
TRG 62.80 Increased By ▲ 1.14 (1.85%)
UNITY 26.95 Increased By ▲ 0.32 (1.2%)
WTL 1.34 Decreased By ▼ -0.02 (-1.47%)
BR100 7,957 Increased By 122.2 (1.56%)
BR30 25,700 Increased By 369.8 (1.46%)
KSE100 75,878 Increased By 1000.4 (1.34%)
KSE30 24,343 Increased By 355.2 (1.48%)

Ministry of Water and Power has said that all the damages caused to the electricity lines by heavy rainstorm on Saturday evening in different areas of the country have been completely restored and there was no forced load shedding on any feeder across the country throughout the day. The statement said that at Sehri time all the domestic feeders in the country were exempted from load shedding one hour before and half an hour after as per the schedule, except for the system constraints that existed in very few areas.
The system currently is generating an average of 15400 MW electricity while at peak time reached upto 16000 MW.
Due to effective measures taken for closing the industry at the time of Iftar, Tarawee and Seheri timings, all the available electricity is being provided to the domestic consumers. Special instructions have been passed to ensure closing the industry on mix feeders so that maximum electricity can be provided to the domestic consumers. According special teams have been formed by each Distraction company to monitor and enforce the load shedding schedule for the industry both on independent and mix feeders.
The Secretary Ministry of Water and Power Mohammad Younus Dagha along with other officials has been continuously monitoring the situation. Regular video and internet link conference is conducted between the Ministry of Water and Power and the Distribution Companies.
The Federal Complaint cell is also working round the clock to redress the complaints from consumers.
The Ministry of Water and Power is working hard to provide maximum relief to the consumers across the country. There are 637,435 transformers at the distribution system across the country expect the Karachi being operated by K-Electric. There may be localised faults or damage for which continuous efforts are being made to attend complaints within shortest time frame.

Copyright Business Recorder, 2015

Comments

Comments are closed.