AIRLINK 74.00 Decreased By ▼ -0.25 (-0.34%)
BOP 5.14 Increased By ▲ 0.09 (1.78%)
CNERGY 4.55 Increased By ▲ 0.13 (2.94%)
DFML 37.15 Increased By ▲ 1.31 (3.66%)
DGKC 89.90 Increased By ▲ 1.90 (2.16%)
FCCL 22.40 Increased By ▲ 0.20 (0.9%)
FFBL 33.03 Increased By ▲ 0.31 (0.95%)
FFL 9.75 Decreased By ▼ -0.04 (-0.41%)
GGL 10.75 Decreased By ▼ -0.05 (-0.46%)
HBL 115.50 Decreased By ▼ -0.40 (-0.35%)
HUBC 137.10 Increased By ▲ 1.26 (0.93%)
HUMNL 9.95 Increased By ▲ 0.11 (1.12%)
KEL 4.60 Decreased By ▼ -0.01 (-0.22%)
KOSM 4.83 Increased By ▲ 0.17 (3.65%)
MLCF 39.75 Decreased By ▼ -0.13 (-0.33%)
OGDC 138.20 Increased By ▲ 0.30 (0.22%)
PAEL 27.00 Increased By ▲ 0.57 (2.16%)
PIAA 24.24 Decreased By ▼ -2.04 (-7.76%)
PIBTL 6.74 Decreased By ▼ -0.02 (-0.3%)
PPL 123.62 Increased By ▲ 0.72 (0.59%)
PRL 27.40 Increased By ▲ 0.71 (2.66%)
PTC 13.90 Decreased By ▼ -0.10 (-0.71%)
SEARL 61.75 Increased By ▲ 3.05 (5.2%)
SNGP 70.15 Decreased By ▼ -0.25 (-0.36%)
SSGC 10.52 Increased By ▲ 0.16 (1.54%)
TELE 8.57 Increased By ▲ 0.01 (0.12%)
TPLP 11.10 Decreased By ▼ -0.28 (-2.46%)
TRG 64.02 Decreased By ▼ -0.21 (-0.33%)
UNITY 26.76 Increased By ▲ 0.71 (2.73%)
WTL 1.38 No Change ▼ 0.00 (0%)
BR100 7,874 Increased By 36.2 (0.46%)
BR30 25,596 Increased By 136 (0.53%)
KSE100 75,342 Increased By 411.7 (0.55%)
KSE30 24,214 Increased By 68.6 (0.28%)

KARACHI: Transmission and distribution (T&D) losses are the biggest challenge the energy sector is confronted with, official of K Electric (KE) said, adding that Aerial Bundles Cables (ABC) are a technology and have helped reduce theft of electricity in the city.

A spokesperson of KE said illegal hook connections and electricity theft compromise the safety of our network and also contribute to line losses, impairing the provision of power to an area.

He said ABC installations have improved the reliability of power supply overall and act as a major deterrent against intrusions on KE infrastructure. Due to this, the frequency of interruptions on the network has also reduced significantly and has contributed in making the network safer as well.”

Similarly, according to NEPRA report, inefficient transformers and massive power theft in various parts of the country remained the key components for T&D losses.

It added that in the last 10 years, K-Electric has managed to reduce its T&D losses to 15.3 percent from 30.85 percent after successfully inducting ABC cables in its network.

In 2022, the transmission and distribution (T&D) losses incurred by all the power distribution companies amounted to Rs113 billion, adding pressure on the already ballooning circular debt. By reducing T&D losses, not only can KE enhance its operational efficiency, but also alleviates the debt burden, the power regulatory authority noted.

It also said that these improvements need to be sustained through rigorous maintenance and upkeep to maximize the advantages of ABC cables.

Copyright Business Recorder, 2023

Comments

Comments are closed.