AIRLINK 72.59 Increased By ▲ 3.39 (4.9%)
BOP 4.99 Increased By ▲ 0.09 (1.84%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.71 Increased By ▲ 0.46 (1.47%)
DGKC 80.90 Increased By ▲ 3.65 (4.72%)
FCCL 21.42 Increased By ▲ 1.42 (7.1%)
FFBL 35.19 Increased By ▲ 0.19 (0.54%)
FFL 9.33 Increased By ▲ 0.21 (2.3%)
GGL 9.82 Increased By ▲ 0.02 (0.2%)
HBL 112.40 Decreased By ▼ -0.36 (-0.32%)
HUBC 136.50 Increased By ▲ 3.46 (2.6%)
HUMNL 7.14 Increased By ▲ 0.19 (2.73%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.67 Increased By ▲ 1.07 (2.92%)
OGDC 137.75 Increased By ▲ 4.88 (3.67%)
PAEL 23.41 Increased By ▲ 0.77 (3.4%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.63 Increased By ▲ 0.17 (2.63%)
PPL 125.05 Increased By ▲ 8.75 (7.52%)
PRL 26.99 Increased By ▲ 1.09 (4.21%)
PTC 13.32 Increased By ▲ 0.24 (1.83%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 70.80 Increased By ▲ 3.20 (4.73%)
SSGC 10.54 No Change ▼ 0.00 (0%)
TELE 8.33 Increased By ▲ 0.05 (0.6%)
TPLP 10.95 Increased By ▲ 0.15 (1.39%)
TRG 60.60 Increased By ▲ 1.31 (2.21%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,566 Increased By 157.7 (2.13%)
BR30 24,786 Increased By 749.4 (3.12%)
KSE100 71,902 Increased By 1235.2 (1.75%)
KSE30 23,595 Increased By 371 (1.6%)

KARACHI: In adherence to Ministry of Energy (Petroleum Division), Government of Pakistan’s priority order for gas load management, where domestic sector tops the list and to serve the domestic customers with even more care and consideration, especially those in Balochistan already experiencing the winter season, gas supplies to all captive power plants of general industries (non-export) across Sindh and Balochistan had to be discontinued.

The discontinuation of gas supplies to all these Captive Power Plants (CPPs) was exercised under the Gas Sales Agreement (GSA) signed with CPPs, as the very agreement clearly states that; “Gas supply will be provided by the Company on ‘as and when available’ basis only during the period March to November each year.

The Consumer will make dual firing arrangements to avoid loss of production as and when Gas is not available during March to November and also during December to February when the Company will keep the Consumer’s Gas supply disconnected at his cost, each year.”

Gas supply to all these CPPs shall remain discontinued till further orders; however zero rated export industry including its CPPs along with the fertilizer sector will continue to get the gas.

The volume of gas curtailed from this arrangement would be diverted to domestic customers for them to cater their enhanced gas loads in context of the winter season.

It may be noted that in Balochistan, supply of additional gas is a must for the survival of human lives since gas serves as a LIFELINE to scores of populace needing to keep themselves warm through water and space heating gas appliances in the extremely low temperatures.

SSGC looks forward to CPPs of General Industries (Non export) for their understanding on the matter and expects their cooperation for serving the domestic customers through uninterrupted gas supplies.

Copyright Business Recorder, 2021

Comments

Comments are closed.