AIRLINK 71.75 Increased By ▲ 2.55 (3.68%)
BOP 5.04 Increased By ▲ 0.14 (2.86%)
CNERGY 4.32 Increased By ▲ 0.06 (1.41%)
DFML 31.69 Increased By ▲ 0.44 (1.41%)
DGKC 80.70 Increased By ▲ 3.45 (4.47%)
FCCL 21.04 Increased By ▲ 1.04 (5.2%)
FFBL 35.30 Increased By ▲ 0.30 (0.86%)
FFL 9.32 Increased By ▲ 0.20 (2.19%)
GGL 9.83 Increased By ▲ 0.03 (0.31%)
HBL 112.25 Decreased By ▼ -0.51 (-0.45%)
HUBC 135.50 Increased By ▲ 2.46 (1.85%)
HUMNL 7.10 Increased By ▲ 0.15 (2.16%)
KEL 4.33 Increased By ▲ 0.10 (2.36%)
KOSM 4.46 Increased By ▲ 0.21 (4.94%)
MLCF 37.52 Increased By ▲ 0.92 (2.51%)
OGDC 136.75 Increased By ▲ 3.88 (2.92%)
PAEL 23.61 Increased By ▲ 0.97 (4.28%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.60 Increased By ▲ 0.14 (2.17%)
PPL 121.85 Increased By ▲ 5.55 (4.77%)
PRL 26.47 Increased By ▲ 0.57 (2.2%)
PTC 13.31 Increased By ▲ 0.23 (1.76%)
SEARL 52.21 Increased By ▲ 0.21 (0.4%)
SNGP 70.50 Increased By ▲ 2.90 (4.29%)
SSGC 10.58 Increased By ▲ 0.04 (0.38%)
TELE 8.40 Increased By ▲ 0.12 (1.45%)
TPLP 11.05 Increased By ▲ 0.25 (2.31%)
TRG 60.13 Increased By ▲ 0.84 (1.42%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,512 Increased By 102.9 (1.39%)
BR30 24,599 Increased By 562.3 (2.34%)
KSE100 71,730 Increased By 1063.3 (1.5%)
KSE30 23,500 Increased By 276.3 (1.19%)

TARBELA: After an improvement in water inflow at Tarbela Dam, the water level on Tuesday slightly increased and was recorded at 1428.27 feet which were 36 feet above the dead level.

According to the Tarbela Dam officials, the water level of the dam remained 36 feet above the dead level which is 1428.27 feet, where only 10 power generation units out of 17 were producing only 1282 megawatts of electricity and they are also not working with full capacity either.

Water inflow in the dam was 151,400 cusecs and outflow 100,000 cusecs feet, dam officials also stated that owing to the low inflow of water we have decreased the outflow in Ghazi Brotha and Indus River.

It was also disclosed that on Tuesday 700 cusecs of water were released for Pehur High-Level Canal (PHLC) to supply water, some areas of Khyber Pakhtunkhwa for irrigation.

Comments

Comments are closed.