AIRLINK 72.59 Increased By ▲ 3.39 (4.9%)
BOP 4.99 Increased By ▲ 0.09 (1.84%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.71 Increased By ▲ 0.46 (1.47%)
DGKC 80.90 Increased By ▲ 3.65 (4.72%)
FCCL 21.42 Increased By ▲ 1.42 (7.1%)
FFBL 35.19 Increased By ▲ 0.19 (0.54%)
FFL 9.33 Increased By ▲ 0.21 (2.3%)
GGL 9.82 Increased By ▲ 0.02 (0.2%)
HBL 112.40 Decreased By ▼ -0.36 (-0.32%)
HUBC 136.50 Increased By ▲ 3.46 (2.6%)
HUMNL 7.14 Increased By ▲ 0.19 (2.73%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.67 Increased By ▲ 1.07 (2.92%)
OGDC 137.75 Increased By ▲ 4.88 (3.67%)
PAEL 23.41 Increased By ▲ 0.77 (3.4%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.63 Increased By ▲ 0.17 (2.63%)
PPL 125.05 Increased By ▲ 8.75 (7.52%)
PRL 26.99 Increased By ▲ 1.09 (4.21%)
PTC 13.32 Increased By ▲ 0.24 (1.83%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 70.80 Increased By ▲ 3.20 (4.73%)
SSGC 10.54 No Change ▼ 0.00 (0%)
TELE 8.33 Increased By ▲ 0.05 (0.6%)
TPLP 10.95 Increased By ▲ 0.15 (1.39%)
TRG 60.60 Increased By ▲ 1.31 (2.21%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,566 Increased By 157.7 (2.13%)
BR30 24,786 Increased By 749.4 (3.12%)
KSE100 71,902 Increased By 1235.2 (1.75%)
KSE30 23,595 Increased By 371 (1.6%)

KARACHI: Administrator Karachi Laeeq Ahmed on Sunday said that the expansion joints of Nagan Chowrangi Flyover are being repaired on priority basis.

"The joints were in bad condition due to which there was a risk of accidents so they are being made useable. Joints will also be replaced where necessary," the Administrator expressed these views while inspecting the ongoing works under the Engineering Department of KMC in different areas of the city. He said that the work is also underway to fix the lights on the expressway to ease traffic at night. He said that KMC is carrying out infrastructure maintenance work with its own resources with the aim of improving roads and highways.

The Administrator Karachi directed Director General Works Shabihul Hasnain Zaidi to inspect the expansion joints of all flyovers and wherever repairs or change are needed, work should be started immediately.

Ahmed said that light and heavy vehicles were plying on Nagan Chowrangi flyover 24 hours a day so the repair work should be done in such a way as to minimize traffic congestion and complete the work expeditiously.

He said that earlier the expansion joints of Liaquatabad and Gharibabad flyovers have been replaced, after which the flow of traffic has improved. The smoothing of the road has also significantly reduced the travel time.

Copyright Business Recorder, 2021

Comments

Comments are closed.