AIRLINK 78.39 Increased By ▲ 5.39 (7.38%)
BOP 5.34 Decreased By ▼ -0.01 (-0.19%)
CNERGY 4.33 Increased By ▲ 0.02 (0.46%)
DFML 30.87 Increased By ▲ 2.32 (8.13%)
DGKC 78.51 Increased By ▲ 4.22 (5.68%)
FCCL 20.58 Increased By ▲ 0.23 (1.13%)
FFBL 32.30 Increased By ▲ 1.40 (4.53%)
FFL 10.22 Increased By ▲ 0.16 (1.59%)
GGL 10.29 Decreased By ▼ -0.10 (-0.96%)
HBL 118.50 Increased By ▲ 2.53 (2.18%)
HUBC 135.10 Increased By ▲ 2.90 (2.19%)
HUMNL 6.87 Increased By ▲ 0.19 (2.84%)
KEL 4.17 Increased By ▲ 0.14 (3.47%)
KOSM 4.73 Increased By ▲ 0.13 (2.83%)
MLCF 38.67 Increased By ▲ 0.13 (0.34%)
OGDC 134.85 Increased By ▲ 1.00 (0.75%)
PAEL 23.40 Decreased By ▼ -0.43 (-1.8%)
PIAA 26.64 Decreased By ▼ -0.49 (-1.81%)
PIBTL 7.02 Increased By ▲ 0.26 (3.85%)
PPL 113.45 Increased By ▲ 0.65 (0.58%)
PRL 27.73 Decreased By ▼ -0.43 (-1.53%)
PTC 14.60 Decreased By ▼ -0.29 (-1.95%)
SEARL 56.50 Increased By ▲ 0.08 (0.14%)
SNGP 66.30 Increased By ▲ 0.50 (0.76%)
SSGC 10.94 Decreased By ▼ -0.07 (-0.64%)
TELE 9.15 Increased By ▲ 0.13 (1.44%)
TPLP 11.67 Decreased By ▼ -0.23 (-1.93%)
TRG 71.43 Increased By ▲ 2.33 (3.37%)
UNITY 24.51 Increased By ▲ 0.80 (3.37%)
WTL 1.33 No Change ▼ 0.00 (0%)
BR100 7,493 Increased By 58.6 (0.79%)
BR30 24,558 Increased By 338.4 (1.4%)
KSE100 72,052 Increased By 692.5 (0.97%)
KSE30 23,808 Increased By 241 (1.02%)

KARACHI: Administrator Karachi Laeeq Ahmed on Sunday said that the expansion joints of Nagan Chowrangi Flyover are being repaired on priority basis.

"The joints were in bad condition due to which there was a risk of accidents so they are being made useable. Joints will also be replaced where necessary," the Administrator expressed these views while inspecting the ongoing works under the Engineering Department of KMC in different areas of the city. He said that the work is also underway to fix the lights on the expressway to ease traffic at night. He said that KMC is carrying out infrastructure maintenance work with its own resources with the aim of improving roads and highways.

The Administrator Karachi directed Director General Works Shabihul Hasnain Zaidi to inspect the expansion joints of all flyovers and wherever repairs or change are needed, work should be started immediately.

Ahmed said that light and heavy vehicles were plying on Nagan Chowrangi flyover 24 hours a day so the repair work should be done in such a way as to minimize traffic congestion and complete the work expeditiously.

He said that earlier the expansion joints of Liaquatabad and Gharibabad flyovers have been replaced, after which the flow of traffic has improved. The smoothing of the road has also significantly reduced the travel time.

Copyright Business Recorder, 2021

Comments

Comments are closed.