AIRLINK 72.59 Increased By ▲ 3.39 (4.9%)
BOP 4.99 Increased By ▲ 0.09 (1.84%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.71 Increased By ▲ 0.46 (1.47%)
DGKC 80.90 Increased By ▲ 3.65 (4.72%)
FCCL 21.42 Increased By ▲ 1.42 (7.1%)
FFBL 35.19 Increased By ▲ 0.19 (0.54%)
FFL 9.33 Increased By ▲ 0.21 (2.3%)
GGL 9.82 Increased By ▲ 0.02 (0.2%)
HBL 112.40 Decreased By ▼ -0.36 (-0.32%)
HUBC 136.50 Increased By ▲ 3.46 (2.6%)
HUMNL 7.14 Increased By ▲ 0.19 (2.73%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.67 Increased By ▲ 1.07 (2.92%)
OGDC 137.75 Increased By ▲ 4.88 (3.67%)
PAEL 23.41 Increased By ▲ 0.77 (3.4%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.63 Increased By ▲ 0.17 (2.63%)
PPL 125.05 Increased By ▲ 8.75 (7.52%)
PRL 26.99 Increased By ▲ 1.09 (4.21%)
PTC 13.32 Increased By ▲ 0.24 (1.83%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 70.80 Increased By ▲ 3.20 (4.73%)
SSGC 10.54 No Change ▼ 0.00 (0%)
TELE 8.33 Increased By ▲ 0.05 (0.6%)
TPLP 10.95 Increased By ▲ 0.15 (1.39%)
TRG 60.60 Increased By ▲ 1.31 (2.21%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,566 Increased By 157.7 (2.13%)
BR30 24,786 Increased By 749.4 (3.12%)
KSE100 71,902 Increased By 1235.2 (1.75%)
KSE30 23,595 Increased By 371 (1.6%)

Boosting trade: Istanbul-Tehran-Islamabad train to commence operation next year

  • The ITI framework was launched in 2009 and exists as a project under the Economic Cooperation Organization
  • The rail route covers a total distance of 6,500 kilometers and is cost and time efficient
Published December 21, 2020

(Karachi) The Istanbul-Tehran-Islamabad (ITI) train is expected to resume operations next year after the key requirements for the revival of the service have been completed, local media has reported.

The ITI framework was launched in 2009 and exists as a project under the Economic Cooperation Organization (ECO). The decision has been taken during the 10th edition of the ECO Transport and Communications Ministers Meeting which was held in Istanbul.

Launch of rail route

The trial run of the ITI train was launched in 2009 as a project under the Economic Cooperation Organization – 10-member Asian trade bloc. However, the rail route has so far only been used for test journeys.

Promoting trade activities

The railway line project has been specifically designed to boost economic ties between Istanbul, Tehran and Islamabad. Besides, the ITI will also be beneficial for Afghanistan, Azerbaijan, Kazakhstan, Kyrgyzstan, Tajikistan, Turkmenistan and Uzbekistan.

Time efficient and cost effective

The railway line intends to greatly reduce the transit route of the goods from Istanbul to Islamabad. During the trial, the freight train from Islamabad to Istanbul took nearly 13 days to make the 6500km journey.

The journey was later further reduced to 11.5 days. In comparison, transporting goods from European countries to Pakistan via seaway took almost 45 days. The train has a maximum capacity for twenty 40-feet containers.

Total distance

The rail route covers a total distance of 6,500 kilometers. It is spread on a length of 2,600 km in Iran, 1,950 km in Turkey and 1,990 km in Pakistan.

Comments

Comments are closed.