AIRLINK 70.50 Decreased By ▼ -2.56 (-3.5%)
BOP 4.96 Decreased By ▼ -0.13 (-2.55%)
CNERGY 4.35 Decreased By ▼ -0.02 (-0.46%)
DFML 31.54 Decreased By ▼ -0.91 (-2.8%)
DGKC 76.98 Increased By ▲ 1.49 (1.97%)
FCCL 19.76 Increased By ▲ 0.24 (1.23%)
FFBL 35.45 Decreased By ▼ -0.70 (-1.94%)
FFL 9.20 Decreased By ▼ -0.02 (-0.22%)
GGL 9.95 Increased By ▲ 0.10 (1.02%)
HBL 113.50 Decreased By ▼ -3.20 (-2.74%)
HUBC 133.43 Increased By ▲ 0.74 (0.56%)
HUMNL 7.02 Decreased By ▼ -0.08 (-1.13%)
KEL 4.37 Decreased By ▼ -0.04 (-0.91%)
KOSM 4.40 No Change ▼ 0.00 (0%)
MLCF 36.60 Increased By ▲ 0.40 (1.1%)
OGDC 134.80 Increased By ▲ 1.30 (0.97%)
PAEL 22.55 Decreased By ▼ -0.05 (-0.22%)
PIAA 25.35 Decreased By ▼ -0.66 (-2.54%)
PIBTL 6.51 Decreased By ▼ -0.04 (-0.61%)
PPL 117.21 Increased By ▲ 1.90 (1.65%)
PRL 26.45 Decreased By ▼ -0.18 (-0.68%)
PTC 13.97 Decreased By ▼ -0.13 (-0.92%)
SEARL 52.75 Decreased By ▼ -0.70 (-1.31%)
SNGP 67.76 Increased By ▲ 0.51 (0.76%)
SSGC 10.57 Decreased By ▼ -0.13 (-1.21%)
TELE 8.60 Increased By ▲ 0.18 (2.14%)
TPLP 10.95 Increased By ▲ 0.20 (1.86%)
TRG 63.33 Decreased By ▼ -0.54 (-0.85%)
UNITY 25.25 Increased By ▲ 0.13 (0.52%)
WTL 1.29 Increased By ▲ 0.02 (1.57%)
BR100 7,466 Increased By 4.8 (0.06%)
BR30 24,212 Increased By 40.4 (0.17%)
KSE100 71,192 Increased By 89 (0.13%)
KSE30 23,426 Increased By 31.7 (0.14%)

imageCAPE CANAVERAL: NASA's test run of a Mars landing system came to a quick end on Monday when the saucer-shaped vehicle's parachute tore away after partly unfurling high over the Pacific Ocean, a NASA TV broadcast showed.

A similar problem bedeviled the Low Density Supersonic Decelerator's (LDSD) debut run last year. The parachute was redesigned and reinforced for the second flight, but more work will be needed before the system is ready to land heavy loads on Mars.

"This is exactly why we do tests like this," NASA engineer and LDSD mission commentator Dan Coatta said after the test. "When we're actually ready to send spacecraft to Mars, we know that they are going to work when that big mission is on the line."

The 100-foot diameter parachute - the largest ever tested - was the second part of a two-part supersonic braking system NASA has been developing for about five years, at a cost of about $230 million.

Like last year, LDSD's doughnut-shaped extension ring inflated as expected, adding surface area to increase the amount of friction and slow the vehicle's descent through the atmosphere.

Copyright Reuters, 2015

Comments

Comments are closed.