AIRLINK 80.60 Increased By ▲ 1.19 (1.5%)
BOP 5.26 Decreased By ▼ -0.07 (-1.31%)
CNERGY 4.52 Increased By ▲ 0.14 (3.2%)
DFML 34.50 Increased By ▲ 1.31 (3.95%)
DGKC 78.90 Increased By ▲ 2.03 (2.64%)
FCCL 20.85 Increased By ▲ 0.32 (1.56%)
FFBL 33.78 Increased By ▲ 2.38 (7.58%)
FFL 9.70 Decreased By ▼ -0.15 (-1.52%)
GGL 10.11 Decreased By ▼ -0.14 (-1.37%)
HBL 117.85 Decreased By ▼ -0.08 (-0.07%)
HUBC 137.80 Increased By ▲ 3.70 (2.76%)
HUMNL 7.05 Increased By ▲ 0.05 (0.71%)
KEL 4.59 Decreased By ▼ -0.08 (-1.71%)
KOSM 4.56 Decreased By ▼ -0.18 (-3.8%)
MLCF 37.80 Increased By ▲ 0.36 (0.96%)
OGDC 137.20 Increased By ▲ 0.50 (0.37%)
PAEL 22.80 Decreased By ▼ -0.35 (-1.51%)
PIAA 26.57 Increased By ▲ 0.02 (0.08%)
PIBTL 6.76 Decreased By ▼ -0.24 (-3.43%)
PPL 114.30 Increased By ▲ 0.55 (0.48%)
PRL 27.33 Decreased By ▼ -0.19 (-0.69%)
PTC 14.59 Decreased By ▼ -0.16 (-1.08%)
SEARL 57.00 Decreased By ▼ -0.20 (-0.35%)
SNGP 66.75 Decreased By ▼ -0.75 (-1.11%)
SSGC 11.00 Decreased By ▼ -0.09 (-0.81%)
TELE 9.11 Decreased By ▼ -0.12 (-1.3%)
TPLP 11.46 Decreased By ▼ -0.10 (-0.87%)
TRG 70.23 Decreased By ▼ -1.87 (-2.59%)
UNITY 25.20 Increased By ▲ 0.38 (1.53%)
WTL 1.33 Decreased By ▼ -0.07 (-5%)
BR100 7,626 Increased By 100.3 (1.33%)
BR30 24,814 Increased By 164.5 (0.67%)
KSE100 72,743 Increased By 771.4 (1.07%)
KSE30 24,034 Increased By 284.8 (1.2%)

asim-hussain ISLAMABAD: Advisor to the Prime Minister on Petroleum and Natural Resources Dr. Asim Hussain has said that efforts are being made to insert additional gas into the system from various sources, including new discoveries, abandoned fields, marginal gases and flared gases.

 

He was chairing a meeting on abandoned, marginal and flared gases, which was attended by Secretary Petroleum, managing directors of the OGDCL and the PPL, Additional Secretary (Petroleum), Director General (Petroleum Concessions) and representatives of Pakistan Petroleum Exploration and Production Companies Association (PPEPCA).

 

Discussions were held on criteria, zonal distribution and pricing of gas from abandoned fields, marginal gases and flared gases.

 

Dr Asim Hussain directed that all-out efforts be made to prepare policy and guidelines for these gases so that additional gas was inserted into the system.

 

An expected 200 MMCFD gas is estimated to be added from these sources, he added.

 

Meanwhile, in a meeting with Luiqi Ciarrocchi, Vice President (Asia Pacific) ENI S.P.A, Dr. Asim Hussain said that the new Petroleum and Exploration Policy 2012 provided investor friendly opportunities to foreign oil and gas companies.

 

Luiqi thanked the Advisor for facilitation provided by the ministry to the ENI regarding its operations in Pakistan.

 

The Advisor said that several exploration blocks had been offered and invited the ENI to participate in the bidding process.

 

The Advisor was informed that three Shale gas pilot projects were being planned and wells would be drilled within 2013.

 

The three projects would require approximately 1100 wells, compared to 1850 drilled in the whole country till date entailing an investment of $ 10 billion.

 

Copyright APP (Associated Press of Pakistan), 2012

Comments

Comments are closed.