AIRLINK 72.13 Increased By ▲ 2.93 (4.23%)
BOP 5.04 Increased By ▲ 0.14 (2.86%)
CNERGY 4.32 Increased By ▲ 0.06 (1.41%)
DFML 31.40 Increased By ▲ 0.15 (0.48%)
DGKC 80.37 Increased By ▲ 3.12 (4.04%)
FCCL 21.03 Increased By ▲ 1.03 (5.15%)
FFBL 34.82 Decreased By ▼ -0.18 (-0.51%)
FFL 9.17 Increased By ▲ 0.05 (0.55%)
GGL 9.81 Increased By ▲ 0.01 (0.1%)
HBL 113.40 Increased By ▲ 0.64 (0.57%)
HUBC 134.20 Increased By ▲ 1.16 (0.87%)
HUMNL 7.02 Increased By ▲ 0.07 (1.01%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.20 Increased By ▲ 0.60 (1.64%)
OGDC 135.40 Increased By ▲ 2.53 (1.9%)
PAEL 23.69 Increased By ▲ 1.05 (4.64%)
PIAA 24.60 Increased By ▲ 0.40 (1.65%)
PIBTL 6.52 Increased By ▲ 0.06 (0.93%)
PPL 120.40 Increased By ▲ 4.10 (3.53%)
PRL 26.33 Increased By ▲ 0.43 (1.66%)
PTC 13.20 Increased By ▲ 0.12 (0.92%)
SEARL 52.40 Increased By ▲ 0.40 (0.77%)
SNGP 71.40 Increased By ▲ 3.80 (5.62%)
SSGC 10.60 Increased By ▲ 0.06 (0.57%)
TELE 8.40 Increased By ▲ 0.12 (1.45%)
TPLP 11.11 Increased By ▲ 0.31 (2.87%)
TRG 60.51 Increased By ▲ 1.22 (2.06%)
UNITY 25.21 Increased By ▲ 0.08 (0.32%)
WTL 1.27 No Change ▼ 0.00 (0%)
BR100 7,490 Increased By 81.2 (1.1%)
BR30 24,512 Increased By 475.5 (1.98%)
KSE100 71,505 Increased By 838.4 (1.19%)
KSE30 23,444 Increased By 220 (0.95%)
Pakistan

Power shortfall reaches 6,500MW mark

RECORDER REPORT LAHORE: Power shortfall has reached to 6500MW due to short supply of fuel to thermal power plants. Re
Published June 12, 2012

  RECORDER REPORT

LAHORE: Power shortfall has reached to 6500MW due to short supply of fuel to thermal power plants. Resultantly power outages intensified both on domestic and commercial fronts. Especially, the industrial units on independent and grouped feeders are the worst hit, as exemption from load shedding has already been withdrawn leading to capacity closures across the board.

However, the NTDC sources said power shortfall is not more than 4482MW with generation of 4417MW through hydel, 1212MW through thermal and 5739MW through IPPs respectively. Meanwhile, power supply to KESC stood at 700MW.

The urban and rural areas witnessed load shedding for 12 and 18 hours respectively. Many urban areas are also short of water supplies, adding salt to public worries.

Comments

Comments are closed.