BR100 Decreased By (-0.91%)
BR30 Decreased By (-1.47%)
KSE100 Decreased By (-0.78%)
KSE30 Decreased By (-0.75%)
AGHA 6.67 Decreased By ▼ -0.01 (-0.15%)
BECO 4.35 Decreased By ▼ -0.02 (-0.46%)
BML 56.17 Decreased By ▼ -1.15 (-2.01%)
BOP 30.12 Decreased By ▼ -0.23 (-0.76%)
CNERGY 12.98 Decreased By ▼ -0.14 (-1.07%)
CSIL 5.31 Decreased By ▼ -0.10 (-1.85%)
FCCL 51.65 Decreased By ▼ -1.14 (-2.16%)
FFL 14.49 Decreased By ▼ -0.23 (-1.56%)
FNEL 1.21 Increased By ▲ 0.09 (8.04%)
KEL 6.06 Decreased By ▼ -0.03 (-0.49%)
KOSM 5.84 Increased By ▲ 0.11 (1.92%)
LOTCHEM 26.17 Decreased By ▼ -0.29 (-1.1%)
MLCF 91.23 Decreased By ▼ -1.93 (-2.07%)
NBP 164.19 Decreased By ▼ -0.47 (-0.29%)
NCPL 53.18 Decreased By ▼ -2.48 (-4.46%)
NPL 59.12 Decreased By ▼ -2.04 (-3.34%)
OGDC 313.39 Decreased By ▼ -3.34 (-1.05%)
PACE 9.77 Decreased By ▼ -0.10 (-1.01%)
PAEL 35.24 Decreased By ▼ -0.39 (-1.09%)
PIBTL 14.71 Increased By ▲ 0.03 (0.2%)
PPL 221.36 Decreased By ▼ -5.55 (-2.45%)
PRL 91.22 Decreased By ▼ -1.80 (-1.94%)
PTC 59.19 Decreased By ▼ -1.07 (-1.78%)
SSGC 23.30 Decreased By ▼ -0.51 (-2.14%)
TBL 8.75 No Change ▼ 0.00 (0%)
TELE 7.61 Decreased By ▼ -0.19 (-2.44%)
TPL 22.03 Decreased By ▼ -0.32 (-1.43%)
TPLP 12.56 Decreased By ▼ -0.41 (-3.16%)
TREET 21.73 Decreased By ▼ -0.43 (-1.94%)
TRG 55.79 Decreased By ▼ -0.77 (-1.36%)
Pakistan

Power shortfall reaches 6,500MW mark

RECORDER REPORT LAHORE: Power shortfall has reached to 6500MW due to short supply of fuel to thermal power plants. Re
Published Updated

  RECORDER REPORT

LAHORE: Power shortfall has reached to 6500MW due to short supply of fuel to thermal power plants. Resultantly power outages intensified both on domestic and commercial fronts. Especially, the industrial units on independent and grouped feeders are the worst hit, as exemption from load shedding has already been withdrawn leading to capacity closures across the board.

However, the NTDC sources said power shortfall is not more than 4482MW with generation of 4417MW through hydel, 1212MW through thermal and 5739MW through IPPs respectively. Meanwhile, power supply to KESC stood at 700MW.

The urban and rural areas witnessed load shedding for 12 and 18 hours respectively. Many urban areas are also short of water supplies, adding salt to public worries.

Comments

Comments are closed for this article.