AIRLINK 72.42 Increased By ▲ 3.22 (4.65%)
BOP 5.00 Increased By ▲ 0.10 (2.04%)
CNERGY 4.28 Increased By ▲ 0.02 (0.47%)
DFML 32.27 Increased By ▲ 1.02 (3.26%)
DGKC 79.30 Increased By ▲ 2.05 (2.65%)
FCCL 20.70 Increased By ▲ 0.70 (3.5%)
FFBL 34.77 Decreased By ▼ -0.23 (-0.66%)
FFL 9.28 Increased By ▲ 0.16 (1.75%)
GGL 9.86 Increased By ▲ 0.06 (0.61%)
HBL 113.39 Increased By ▲ 0.63 (0.56%)
HUBC 133.80 Increased By ▲ 0.76 (0.57%)
HUMNL 7.00 Increased By ▲ 0.05 (0.72%)
KEL 4.24 Increased By ▲ 0.01 (0.24%)
KOSM 4.42 Increased By ▲ 0.17 (4%)
MLCF 36.95 Increased By ▲ 0.35 (0.96%)
OGDC 133.30 Increased By ▲ 0.43 (0.32%)
PAEL 23.75 Increased By ▲ 1.11 (4.9%)
PIAA 24.86 Increased By ▲ 0.66 (2.73%)
PIBTL 6.47 Increased By ▲ 0.01 (0.15%)
PPL 117.58 Increased By ▲ 1.28 (1.1%)
PRL 26.23 Increased By ▲ 0.33 (1.27%)
PTC 13.19 Increased By ▲ 0.11 (0.84%)
SEARL 52.60 Increased By ▲ 0.60 (1.15%)
SNGP 68.20 Increased By ▲ 0.60 (0.89%)
SSGC 10.47 Decreased By ▼ -0.07 (-0.66%)
TELE 8.36 Increased By ▲ 0.08 (0.97%)
TPLP 11.10 Increased By ▲ 0.30 (2.78%)
TRG 58.80 Decreased By ▼ -0.49 (-0.83%)
UNITY 25.24 Increased By ▲ 0.11 (0.44%)
WTL 1.27 No Change ▼ 0.00 (0%)
BR100 7,444 Increased By 35 (0.47%)
BR30 24,250 Increased By 213.6 (0.89%)
KSE100 71,126 Increased By 458.7 (0.65%)
KSE30 23,308 Increased By 83.9 (0.36%)
Pakistan

Power shortfall reaches 6,500MW mark

RECORDER REPORT LAHORE: Power shortfall has reached to 6500MW due to short supply of fuel to thermal power plants. Re
Published June 12, 2012

  RECORDER REPORT

LAHORE: Power shortfall has reached to 6500MW due to short supply of fuel to thermal power plants. Resultantly power outages intensified both on domestic and commercial fronts. Especially, the industrial units on independent and grouped feeders are the worst hit, as exemption from load shedding has already been withdrawn leading to capacity closures across the board.

However, the NTDC sources said power shortfall is not more than 4482MW with generation of 4417MW through hydel, 1212MW through thermal and 5739MW through IPPs respectively. Meanwhile, power supply to KESC stood at 700MW.

The urban and rural areas witnessed load shedding for 12 and 18 hours respectively. Many urban areas are also short of water supplies, adding salt to public worries.

Comments

Comments are closed.