AIRLINK 72.59 Increased By ▲ 3.39 (4.9%)
BOP 4.99 Increased By ▲ 0.09 (1.84%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.71 Increased By ▲ 0.46 (1.47%)
DGKC 80.90 Increased By ▲ 3.65 (4.72%)
FCCL 21.42 Increased By ▲ 1.42 (7.1%)
FFBL 35.19 Increased By ▲ 0.19 (0.54%)
FFL 9.33 Increased By ▲ 0.21 (2.3%)
GGL 9.82 Increased By ▲ 0.02 (0.2%)
HBL 112.40 Decreased By ▼ -0.36 (-0.32%)
HUBC 136.50 Increased By ▲ 3.46 (2.6%)
HUMNL 7.14 Increased By ▲ 0.19 (2.73%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.67 Increased By ▲ 1.07 (2.92%)
OGDC 137.75 Increased By ▲ 4.88 (3.67%)
PAEL 23.41 Increased By ▲ 0.77 (3.4%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.63 Increased By ▲ 0.17 (2.63%)
PPL 125.05 Increased By ▲ 8.75 (7.52%)
PRL 26.99 Increased By ▲ 1.09 (4.21%)
PTC 13.32 Increased By ▲ 0.24 (1.83%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 70.80 Increased By ▲ 3.20 (4.73%)
SSGC 10.54 No Change ▼ 0.00 (0%)
TELE 8.33 Increased By ▲ 0.05 (0.6%)
TPLP 10.95 Increased By ▲ 0.15 (1.39%)
TRG 60.60 Increased By ▲ 1.31 (2.21%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,566 Increased By 157.7 (2.13%)
BR30 24,786 Increased By 749.4 (3.12%)
KSE100 71,902 Increased By 1235.2 (1.75%)
KSE30 23,595 Increased By 371 (1.6%)
Pakistan

World’s highest airport begins construction under CPEC

The airport, which will be built at the Pamir Plateau at an elevation of 4,500 meters, is part of the China Pakista
Published April 29, 2020
  • The airport, which will be built at the Pamir Plateau at an elevation of 4,500 meters, is part of the China Pakistan Economic Corridor (CPEC).

China has begun the construction of what would be the world's highest airport on completion, at its northwest Xinjiang Uygur Autonomous Region.

The airport, which will be built at the Pamir Plateau at an elevation of 4,500 meters, is part of the China Pakistan Economic Corridor (CPEC) and the Belt and Road Initiative (BRI).

As per Chinese media outlet CGTN, the airport will cost about $230 million, the airport runway will be measuring 3,800 meters long and 45 meters wide, and will have a terminal of 3,000 square meters and an apron with four stands, among other facilities.

The airport will be able to accommodate 160,000 passengers and 400 tons of cargoes annually.

As per building authorities, the airport upon completion is expected to bring a lot more tourists into Pamirs Plateau, noted for its natural beauty and unique Tajik culture, however, it remains inaccessible due to rough terrain.

The airport construction is expected to complete by the first half of 2022.

Comments

Comments are closed.