BR100 Increased By (1.44%)
BR30 Increased By (1.71%)
KSE100 Increased By (1.21%)
KSE30 Increased By (1.26%)
BECO 5.65 Increased By ▲ 0.06 (1.07%)
BML 62.00 Increased By ▲ 0.97 (1.59%)
BOP 33.85 Increased By ▲ 0.60 (1.8%)
CNERGY 8.16 Increased By ▲ 0.11 (1.37%)
DCL 11.52 Increased By ▲ 0.22 (1.95%)
FCCL 53.80 Increased By ▲ 0.87 (1.64%)
FCSC 5.45 Increased By ▲ 0.11 (2.06%)
FFL 17.88 Increased By ▲ 0.27 (1.53%)
FNEL 1.33 Increased By ▲ 0.02 (1.53%)
HUMNL 11.10 Decreased By ▼ -0.02 (-0.18%)
KEL 8.05 Increased By ▲ 0.16 (2.03%)
KOSM 5.39 Increased By ▲ 0.06 (1.13%)
MLCF 86.77 Increased By ▲ 1.42 (1.66%)
NBP 184.32 Increased By ▲ 3.03 (1.67%)
PACE 11.75 Increased By ▲ 0.22 (1.91%)
PAEL 40.22 Increased By ▲ 0.81 (2.06%)
PIAHCLA 25.99 Increased By ▲ 0.36 (1.4%)
PIBTL 17.38 Increased By ▲ 0.23 (1.34%)
PPL 228.38 Increased By ▲ 3.56 (1.58%)
PRL 34.60 Increased By ▲ 0.42 (1.23%)
PTC 66.45 Increased By ▲ 1.37 (2.11%)
SEARL 91.11 Increased By ▲ 1.51 (1.69%)
SSGC 26.69 Increased By ▲ 0.38 (1.44%)
TELE 8.46 Increased By ▲ 0.08 (0.95%)
THCCL 71.52 Increased By ▲ 2.18 (3.14%)
TPLP 10.87 Increased By ▲ 0.59 (5.74%)
TREET 24.59 Increased By ▲ 0.39 (1.61%)
TRG 70.82 Increased By ▲ 1.28 (1.84%)
WAVES 11.29 Increased By ▲ 0.26 (2.36%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
Business & Finance

Power supply to Dhabeji pumping station restored on priority: K-Electric

KARACHI: K-Electric priorities power supply to all strategic locations of Karachi Water and Sewerage Board (KWSB) in
Published June 15, 2019 Updated June 15, 2019 10:26pm

KARACHI: K-Electric priorities power supply to all strategic locations of Karachi Water and Sewerage Board (KWSB) including the pumping stations at Dhabeji, Pipri and Gharo.

K-Electric spokesperson said here on Saturday that the power utility's maintenance and repair teams were immediately mobilized  or swift restoration of supply.

The teams worked tirelessly while adhering to all safety parameters and ensured timely rectification of the fault.

All KWSB major water pumping stations are exempt from load-shed in the greater interest of the people of Karachi, he added.

In addition to ensuring seamless power supply to all strategic installations of KWSB, KE also extends all possible technical support and maintains close coordination with KWSB teams round the clock.

The power utility has also deputed a dedicated technical team for priority resolution of any technical issues at KWSB strategic facilities and KE teams also periodically conduct surveys at Dhabeji and other strategic installations of KW&SB to ensure KE operations remain seamless.

Copyright APP (Associated Press of Pakistan), 2019
 

Comments

Comments are closed for this article.