AIRLINK 76.15 Increased By ▲ 1.75 (2.35%)
BOP 4.86 Decreased By ▼ -0.09 (-1.82%)
CNERGY 4.31 Decreased By ▼ -0.03 (-0.69%)
DFML 46.65 Increased By ▲ 1.92 (4.29%)
DGKC 89.25 Increased By ▲ 1.98 (2.27%)
FCCL 23.48 Increased By ▲ 0.58 (2.53%)
FFBL 33.36 Increased By ▲ 1.71 (5.4%)
FFL 9.35 Decreased By ▼ -0.01 (-0.11%)
GGL 10.10 No Change ▼ 0.00 (0%)
HASCOL 6.66 Decreased By ▼ -0.11 (-1.62%)
HBL 113.77 Increased By ▲ 0.17 (0.15%)
HUBC 143.90 Increased By ▲ 3.75 (2.68%)
HUMNL 11.85 Decreased By ▼ -0.06 (-0.5%)
KEL 4.99 Increased By ▲ 0.12 (2.46%)
KOSM 4.40 No Change ▼ 0.00 (0%)
MLCF 38.50 Increased By ▲ 0.10 (0.26%)
OGDC 133.70 Increased By ▲ 0.90 (0.68%)
PAEL 25.39 Increased By ▲ 0.94 (3.84%)
PIBTL 6.75 Increased By ▲ 0.22 (3.37%)
PPL 120.01 Increased By ▲ 0.37 (0.31%)
PRL 26.16 Increased By ▲ 0.28 (1.08%)
PTC 13.89 Increased By ▲ 0.14 (1.02%)
SEARL 57.50 Increased By ▲ 0.25 (0.44%)
SNGP 66.30 Decreased By ▼ -0.10 (-0.15%)
SSGC 10.10 Decreased By ▼ -0.05 (-0.49%)
TELE 8.10 Increased By ▲ 0.15 (1.89%)
TPLP 10.61 Decreased By ▼ -0.03 (-0.28%)
TRG 62.80 Increased By ▲ 1.14 (1.85%)
UNITY 26.95 Increased By ▲ 0.32 (1.2%)
WTL 1.34 Decreased By ▼ -0.02 (-1.47%)
BR100 7,957 Increased By 122.2 (1.56%)
BR30 25,700 Increased By 369.8 (1.46%)
KSE100 75,878 Increased By 1000.4 (1.34%)
KSE30 24,343 Increased By 355.2 (1.48%)

Prime Minister Nawaz Sharif has said overcoming terrorism and electricity shortage is the top priority of the government. He was talking to German Ambassador to Pakistan Dr Cyrill Nunn who called on him in Islamabad on Friday. The Prime Minister lauded German Ambassador for strengthening bilateral relations between the two countries. Meanwhile, it is reported that electricity shortfall has reached at least 4,400MW leading to increased hours of outages countrywide.
At least 12-hour long outages are being carried out in rural while eight-hour long in urban areas. It is reported that the demand of electricity is 19,300MW whereas the production is 14,900MW. The shortfall has reached 4,400MW due to increase in power demand. Besides this, duration of load shedding in areas going through line losses is more than 12 hours.

Copyright News Network International, 2015

Comments

Comments are closed.