BR100 Increased By (0.2%)
BR30 Increased By (0.41%)
KSE100 Increased By (0.07%)
KSE30 Increased By (0.23%)
AGHA 7.75 Decreased By ▼ -0.17 (-2.15%)
BECO 5.19 Decreased By ▼ -0.01 (-0.19%)
BML 58.66 Decreased By ▼ -0.59 (-1%)
BOP 33.69 Increased By ▲ 0.01 (0.03%)
CNERGY 10.61 Increased By ▲ 0.80 (8.15%)
CSIL 5.30 Decreased By ▼ -0.12 (-2.21%)
FCCL 53.74 Increased By ▲ 0.22 (0.41%)
FFL 16.46 Decreased By ▼ -0.22 (-1.32%)
FNEL 1.22 Increased By ▲ 0.01 (0.83%)
KEL 7.28 Decreased By ▼ -0.07 (-0.95%)
KOSM 5.64 Increased By ▲ 0.03 (0.53%)
LOTCHEM 29.65 Increased By ▲ 0.54 (1.86%)
MLCF 96.36 Increased By ▲ 0.86 (0.9%)
NBP 203.53 Decreased By ▼ -0.82 (-0.4%)
NCPL 56.85 Decreased By ▼ -1.39 (-2.39%)
NPL 67.31 Decreased By ▼ -0.48 (-0.71%)
OGDC 318.22 Increased By ▲ 0.28 (0.09%)
PACE 10.63 Decreased By ▼ -0.08 (-0.75%)
PAEL 41.77 Decreased By ▼ -0.06 (-0.14%)
PIBTL 16.81 Increased By ▲ 0.31 (1.88%)
PPL 220.17 Increased By ▲ 0.43 (0.2%)
PRL 49.05 Increased By ▲ 4.46 (10%)
PTC 70.01 Decreased By ▼ -0.76 (-1.07%)
SSGC 29.14 Increased By ▲ 0.21 (0.73%)
TBL 9.77 Decreased By ▼ -0.07 (-0.71%)
TELE 8.82 Increased By ▲ 0.06 (0.68%)
TPL 17.17 Increased By ▲ 0.72 (4.38%)
TPLP 12.51 Increased By ▲ 0.41 (3.39%)
TREET 22.59 Decreased By ▼ -0.21 (-0.92%)
TRG 60.22 Increased By ▲ 0.19 (0.32%)
By

ISLAMABAD: The Pakistan Environmental Protection Agency (Pak-EPA) will hold the public hearing of the environmental impact assessment (EIA) Report of the construction of a private housing scheme, Faisal Residencia Housing Scheme to be built in Mouza Pind Pariyan and Mouza Dora, Zone-2 of Sector E-17.

The public hearing will be held on May 8, on Monday at 11 am at Anabia’s Marriage Hall, Tarnol Fateh Jang Kohat Road.

The EIA Report of any development project provides a detailed information on the existing environmental conditions, description of the project, analysis of the impacts and suggested mitigation measures to be implemented during the execution of the proposed project.

The Agency had issued public notice that had appeared in the leading national newspapers to apprise general public, local area community and others to attend the public hearing and give their insights, concerns, suggestions and recommendations on the project.

The proposed project is under planning to be launched and implemented by ZEDEM International Pvt. Ltd.

The project site is located adjacent to Cabinet Division Employees Cooperative Housing Society E-17 on the North and MPCHS Multi Professionals Cooperative Housing Society F-17 on the East, open land or nullah and Gulshan E Sehate E-18 on the West, MPCHS Multi Professionals Cooperative Housing Society F-17 on the South and Pind Pariyan and have access to Kohat Road.

The construction cost of Faisal Residencia was estimated to be Rs 1.83 billion excluding the cost of the land.

The Housing Society would be constructed at an area of 1220.6 Kanals of land which will be developed for residential and commercial purpose.

The project will comprise of 1164 plots for residential and 8 plots for blue or commercial area, open spaces, parks, public building areas, graveyard and roads.

The Society would have surface water drainage, sewerage network and sewage treatment plant, water supply network including tube wells, overhead tanks, water purification and filtration plant for drinking water, electricity distribution network, street lights, Sui-Gas distribution network as per SNGPL standard, underground telecommunication network, mosque, commercial area, public building, parks and green areas.

According to the EIA Report, all payments were already done to the land owners for acquiring the land, very low cultivation in the area as there was no cultivatable land present on the project site, to prevent soil erosion and degradation the quantities of excavation and fill material would be carefully carried out.

The area did not have any significant number of vegetation and mostly uncultivatable.

The EIA Report public hearing is mandatory under the Pakistan Environmental Protection Act 1997 for the project proponent to seek an environmental approval from Pak-EPA prior to attain a no objection certificate from the Capital Development Authority (CDA) to initiate construction.

Comments

Comments are closed for this article.