AIRLINK 72.59 Increased By ▲ 3.39 (4.9%)
BOP 4.99 Increased By ▲ 0.09 (1.84%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.71 Increased By ▲ 0.46 (1.47%)
DGKC 80.90 Increased By ▲ 3.65 (4.72%)
FCCL 21.42 Increased By ▲ 1.42 (7.1%)
FFBL 35.19 Increased By ▲ 0.19 (0.54%)
FFL 9.33 Increased By ▲ 0.21 (2.3%)
GGL 9.82 Increased By ▲ 0.02 (0.2%)
HBL 112.40 Decreased By ▼ -0.36 (-0.32%)
HUBC 136.50 Increased By ▲ 3.46 (2.6%)
HUMNL 7.14 Increased By ▲ 0.19 (2.73%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.67 Increased By ▲ 1.07 (2.92%)
OGDC 137.75 Increased By ▲ 4.88 (3.67%)
PAEL 23.41 Increased By ▲ 0.77 (3.4%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.63 Increased By ▲ 0.17 (2.63%)
PPL 125.05 Increased By ▲ 8.75 (7.52%)
PRL 26.99 Increased By ▲ 1.09 (4.21%)
PTC 13.32 Increased By ▲ 0.24 (1.83%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 70.80 Increased By ▲ 3.20 (4.73%)
SSGC 10.54 No Change ▼ 0.00 (0%)
TELE 8.33 Increased By ▲ 0.05 (0.6%)
TPLP 10.95 Increased By ▲ 0.15 (1.39%)
TRG 60.60 Increased By ▲ 1.31 (2.21%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,566 Increased By 157.7 (2.13%)
BR30 24,786 Increased By 749.4 (3.12%)
KSE100 71,902 Increased By 1235.2 (1.75%)
KSE30 23,595 Increased By 371 (1.6%)

LAHORE: The Lahore Electric Supply Company (Lesco) is leading rest of the distribution companies (Discos) in receiving applications for net-metering, issuance of generation licences by National Electric Power Regulatory Authority (Nepra) and commissioning of the capacities, said sources.

According to reliable sources in the Alternative Energy Development Board, the Lesco has received 2,995 applications with a total capacity of 58785.2 kilowatt till February 28, 2021. Against these applications, the Nepra has issued licences against 2,704 applications with a generation capacity of 50.14 megawatts out of which 2,494 applicants have commissioned their systems, carrying a generation capacity of 46.02 megawatts.

The net metering is an electricity policy for consumers who own/plan to set up a renewable energy facility which allows them to produce electricity (using wind and solar) for their own use and supply the excess produce to the national grid setting-off units of electricity consumed during off-peak hours or at times when the production from the RE facility is not enough to meet the consumer load.

The consumer will either pay a reduced utility bill or get paid for access energy exported to the grid as stated in the contract with the relevant Disco.

The Nepra, in September 2015, issued its net-metering regulations that allow the Discos in Pakistan to purchase excess units of electricity produced by the consumers, and net them off against the units consumed from the grid. The renewable energy is a long-term power solution. The solar PV technology gives access to affordable electricity supply during system life. The residential and commercial customers can switch their electricity load to renewable energy (RE) and can slash their power bills. The picture below illustrates the flow of electricity from the distribution company to the end-user who can now install a renewable energy facility and send the excess electricity back to the distribution grid and earn credit for his exports.

The Lesco is followed by Islamabad Electric Supply Company, K-Electric, Multan Electric Power Company, Faisalabad Electric Supply Company, Gujranwala Electric Power Company, Peshawar Electric Supply Company, and EME (DHA) while the share of the rest of the Discos is quite negligible.

Copyright Business Recorder, 2021

Comments

Comments are closed.