AIRLINK 80.60 Increased By ▲ 1.19 (1.5%)
BOP 5.26 Decreased By ▼ -0.07 (-1.31%)
CNERGY 4.52 Increased By ▲ 0.14 (3.2%)
DFML 34.50 Increased By ▲ 1.31 (3.95%)
DGKC 78.90 Increased By ▲ 2.03 (2.64%)
FCCL 20.85 Increased By ▲ 0.32 (1.56%)
FFBL 33.78 Increased By ▲ 2.38 (7.58%)
FFL 9.70 Decreased By ▼ -0.15 (-1.52%)
GGL 10.11 Decreased By ▼ -0.14 (-1.37%)
HBL 117.85 Decreased By ▼ -0.08 (-0.07%)
HUBC 137.80 Increased By ▲ 3.70 (2.76%)
HUMNL 7.05 Increased By ▲ 0.05 (0.71%)
KEL 4.59 Decreased By ▼ -0.08 (-1.71%)
KOSM 4.56 Decreased By ▼ -0.18 (-3.8%)
MLCF 37.80 Increased By ▲ 0.36 (0.96%)
OGDC 137.20 Increased By ▲ 0.50 (0.37%)
PAEL 22.80 Decreased By ▼ -0.35 (-1.51%)
PIAA 26.57 Increased By ▲ 0.02 (0.08%)
PIBTL 6.76 Decreased By ▼ -0.24 (-3.43%)
PPL 114.30 Increased By ▲ 0.55 (0.48%)
PRL 27.33 Decreased By ▼ -0.19 (-0.69%)
PTC 14.59 Decreased By ▼ -0.16 (-1.08%)
SEARL 57.00 Decreased By ▼ -0.20 (-0.35%)
SNGP 66.75 Decreased By ▼ -0.75 (-1.11%)
SSGC 11.00 Decreased By ▼ -0.09 (-0.81%)
TELE 9.11 Decreased By ▼ -0.12 (-1.3%)
TPLP 11.46 Decreased By ▼ -0.10 (-0.87%)
TRG 70.23 Decreased By ▼ -1.87 (-2.59%)
UNITY 25.20 Increased By ▲ 0.38 (1.53%)
WTL 1.33 Decreased By ▼ -0.07 (-5%)
BR100 7,629 Increased By 103 (1.37%)
BR30 24,842 Increased By 192.5 (0.78%)
KSE100 72,743 Increased By 771.4 (1.07%)
KSE30 24,034 Increased By 284.8 (1.2%)
Pakistan

Tarbela Dam power generation reaches 700 MW

  • 5 out of 12 power generation units of the dam were producing only 700 megawatts of electricity and 12 units were shut down.
Published January 18, 2021

TARBAILA: Despite low water inflow in the Tarbela dam reservoir Monday the power generation of the dam increased to 700 Mega Watts.

According to the Tarbela Dam officials, from the last two weeks, the power generation of the Tarbela reaches its lowest where inflow remained up to 14000 cusec feet.

The water level of Tarbela dams was reduced to 1470.73 feet owing to the decreased water inflow. Today the dam produced only 700 megawatts of electricity while only five power generation units were working with low capacity.

5 out of 12 power generation units of the dam were producing only 700 megawatts of electricity and 12 units were shut down.

Today water inflow in the Tarbela reservoir was recorded 14300 cusec feet while outflow remained at 14300 cusecs feet.

It was also disclosed that today 700 cusec water was released for Pehur High-Level Canal (PHLC) to supply water for some areas of KPK for irrigation.

Due to the decreased water inflow after falling the temperatures in upper parts of Gilgit Baltistan the water level of Tarbela dam also reduced to 1470.73 feet.

Comments

Comments are closed.