AIRLINK 72.35 Decreased By ▼ -1.75 (-2.36%)
BOP 5.05 Increased By ▲ 0.05 (1%)
CNERGY 4.43 Increased By ▲ 0.09 (2.07%)
DFML 29.84 Increased By ▲ 0.30 (1.02%)
DGKC 84.60 Increased By ▲ 1.05 (1.26%)
FCCL 22.59 Increased By ▲ 0.16 (0.71%)
FFBL 34.32 Decreased By ▼ -0.58 (-1.66%)
FFL 10.24 Increased By ▲ 0.37 (3.75%)
GGL 10.30 Increased By ▲ 0.30 (3%)
HBL 112.91 Increased By ▲ 0.91 (0.81%)
HUBC 141.25 Increased By ▲ 3.56 (2.59%)
HUMNL 8.03 Increased By ▲ 1.05 (15.04%)
KEL 4.47 Increased By ▲ 0.07 (1.59%)
KOSM 4.54 Decreased By ▼ -0.05 (-1.09%)
MLCF 38.56 Increased By ▲ 0.01 (0.03%)
OGDC 134.90 Decreased By ▼ -1.70 (-1.24%)
PAEL 26.61 Increased By ▲ 1.47 (5.85%)
PIAA 25.99 Decreased By ▼ -0.52 (-1.96%)
PIBTL 6.58 Decreased By ▼ -0.07 (-1.05%)
PPL 122.00 Decreased By ▼ -3.40 (-2.71%)
PRL 28.39 Increased By ▲ 0.18 (0.64%)
PTC 13.95 Decreased By ▼ -0.35 (-2.45%)
SEARL 55.81 Increased By ▲ 1.21 (2.22%)
SNGP 70.65 Decreased By ▼ -0.55 (-0.77%)
SSGC 10.47 Decreased By ▼ -0.03 (-0.29%)
TELE 8.59 Increased By ▲ 0.07 (0.82%)
TPLP 10.99 Increased By ▲ 0.05 (0.46%)
TRG 61.65 Increased By ▲ 0.95 (1.57%)
UNITY 25.30 Decreased By ▼ -0.03 (-0.12%)
WTL 1.30 Increased By ▲ 0.04 (3.17%)
BR100 7,667 Increased By 2.6 (0.03%)
BR30 25,143 Increased By 118 (0.47%)
KSE100 73,132 Increased By 367.5 (0.51%)
KSE30 23,743 Decreased By -32.1 (-0.13%)
Pakistan

Annual inspection of railways lines starts from Dec 28

  • According to notification issued by Farman Ghani, Deputy General Manager from railways headquarters office Lahore, railways line stretching 151 km between Lodhran to Khanpur (DN Line) would be reviewed on 28th December.
Published December 16, 2020

MULTAN: Chief Executive Officer/Senior General Manager and Federal Government Inspector of Railways Inspection of Multan division would carry out inspection of three different railways’ routes comprising 506 kilometers long from 28th to 30th December, this month.

According to notification issued by Farman Ghani, Deputy General Manager from railways headquarters office Lahore, railways line stretching 151 km between Lodhran to Khanpur (DN Line) would be reviewed on 28th December.

The long route stretched from Kashmor Colony to DG Khan with total length of 226 km would be checked on 29th December, while the line stretching between Kot Addu to Bakhar having 129 km long distance would be gone through testing process on 30th of this month.

Comments

Comments are closed.