AIRLINK 74.00 Decreased By ▼ -0.25 (-0.34%)
BOP 5.14 Increased By ▲ 0.09 (1.78%)
CNERGY 4.55 Increased By ▲ 0.13 (2.94%)
DFML 37.15 Increased By ▲ 1.31 (3.66%)
DGKC 89.90 Increased By ▲ 1.90 (2.16%)
FCCL 22.40 Increased By ▲ 0.20 (0.9%)
FFBL 33.03 Increased By ▲ 0.31 (0.95%)
FFL 9.75 Decreased By ▼ -0.04 (-0.41%)
GGL 10.75 Decreased By ▼ -0.05 (-0.46%)
HBL 115.50 Decreased By ▼ -0.40 (-0.35%)
HUBC 137.10 Increased By ▲ 1.26 (0.93%)
HUMNL 9.95 Increased By ▲ 0.11 (1.12%)
KEL 4.60 Decreased By ▼ -0.01 (-0.22%)
KOSM 4.83 Increased By ▲ 0.17 (3.65%)
MLCF 39.75 Decreased By ▼ -0.13 (-0.33%)
OGDC 138.20 Increased By ▲ 0.30 (0.22%)
PAEL 27.00 Increased By ▲ 0.57 (2.16%)
PIAA 24.24 Decreased By ▼ -2.04 (-7.76%)
PIBTL 6.74 Decreased By ▼ -0.02 (-0.3%)
PPL 123.62 Increased By ▲ 0.72 (0.59%)
PRL 27.40 Increased By ▲ 0.71 (2.66%)
PTC 13.90 Decreased By ▼ -0.10 (-0.71%)
SEARL 61.75 Increased By ▲ 3.05 (5.2%)
SNGP 70.15 Decreased By ▼ -0.25 (-0.36%)
SSGC 10.52 Increased By ▲ 0.16 (1.54%)
TELE 8.57 Increased By ▲ 0.01 (0.12%)
TPLP 11.10 Decreased By ▼ -0.28 (-2.46%)
TRG 64.02 Decreased By ▼ -0.21 (-0.33%)
UNITY 26.76 Increased By ▲ 0.71 (2.73%)
WTL 1.38 No Change ▼ 0.00 (0%)
BR100 7,874 Increased By 36.2 (0.46%)
BR30 25,596 Increased By 136 (0.53%)
KSE100 75,342 Increased By 411.7 (0.55%)
KSE30 24,214 Increased By 68.6 (0.28%)

imageLAHORE: Lahore Chamber of Commerce and Industry (LCCI) on Monday advocated an early construction of Kalabagh Dam saying that this dam was crucial to cope with the challenges energy shortage, food security, famine and floods.

LCCI President Sheikh Muhammad Arshad, Senior Vice President Almas Hyder and Vice President Nasir Saeed told the media here that in the absence of a mega dam, the country was suffering from a loss of Rs 132 billion annually.

They added that according to experts, there was no threat to Nowshehra city as it was 150 feet above the water level, asserting that historical data indicated that during past 75 years average 146 million acres of water was available per year in River Indus.

The LCCI office-bearers said that all stakeholders should show maturity on the issue, citing that unlike Pakistan, India was constructing dams at every possible site and had left us decades behind.

They said that everyone knows that the existing dams are constantly silting up leaving ever-decreasing capacity to store water.

The construction of the KBD along with other new dams was desperately needed to store adequate water. According to a conservative estimate about 30 million acres feet of water was being wasted into the sea because the country had no big water reservoirs to store it.

More importantly, as a result of melting of glaciers due to global warming, a sword of Damocles remains hanging over our heads in the shape of floods.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed.