BR100 Increased By (0.3%)
BR30 Increased By (0.41%)
KSE100 Decreased By (-0.14%)
KSE30 Decreased By (-0.13%)
AGHA 7.47 Decreased By ▼ -0.09 (-1.19%)
BECO 5.17 Increased By ▲ 0.08 (1.57%)
BML 54.71 Decreased By ▼ -0.27 (-0.49%)
BOP 33.10 Increased By ▲ 0.12 (0.36%)
CNERGY 10.35 Increased By ▲ 0.25 (2.48%)
CSIL 5.13 No Change ▼ 0.00 (0%)
FCCL 52.25 Increased By ▲ 1.00 (1.95%)
FFL 16.50 Increased By ▲ 0.32 (1.98%)
FNEL 1.22 Increased By ▲ 0.03 (2.52%)
KEL 7.21 Increased By ▲ 0.15 (2.12%)
KOSM 5.86 Increased By ▲ 0.32 (5.78%)
LOTCHEM 27.17 Decreased By ▼ -1.95 (-6.7%)
MLCF 90.30 Increased By ▲ 1.48 (1.67%)
NBP 196.90 Decreased By ▼ -0.59 (-0.3%)
NCPL 55.70 Increased By ▲ 0.68 (1.24%)
NPL 65.49 Increased By ▲ 0.61 (0.94%)
OGDC 313.78 Increased By ▲ 1.83 (0.59%)
PACE 10.40 Increased By ▲ 0.19 (1.86%)
PAEL 41.25 Increased By ▲ 0.26 (0.63%)
PIBTL 16.06 Increased By ▲ 0.10 (0.63%)
PPL 213.83 Increased By ▲ 1.17 (0.55%)
PRL 54.15 Increased By ▲ 1.61 (3.06%)
PTC 69.99 Increased By ▲ 0.91 (1.32%)
SSGC 25.16 Increased By ▲ 0.06 (0.24%)
TBL 9.56 Decreased By ▼ -0.06 (-0.62%)
TELE 8.37 Increased By ▲ 0.05 (0.6%)
TPL 18.20 Increased By ▲ 0.45 (2.54%)
TPLP 13.10 Decreased By ▼ -0.12 (-0.91%)
TREET 21.41 Decreased By ▼ -0.33 (-1.52%)
TRG 59.98 Increased By ▲ 3.09 (5.43%)
Pakistan

LCCI stresses Kalabagh Dam construction

Published Updated

imageLAHORE: Lahore Chamber of Commerce and Industry (LCCI) on Monday advocated an early construction of Kalabagh Dam saying that this dam was crucial to cope with the challenges energy shortage, food security, famine and floods.

LCCI President Sheikh Muhammad Arshad, Senior Vice President Almas Hyder and Vice President Nasir Saeed told the media here that in the absence of a mega dam, the country was suffering from a loss of Rs 132 billion annually.

They added that according to experts, there was no threat to Nowshehra city as it was 150 feet above the water level, asserting that historical data indicated that during past 75 years average 146 million acres of water was available per year in River Indus.

The LCCI office-bearers said that all stakeholders should show maturity on the issue, citing that unlike Pakistan, India was constructing dams at every possible site and had left us decades behind.

They said that everyone knows that the existing dams are constantly silting up leaving ever-decreasing capacity to store water.

The construction of the KBD along with other new dams was desperately needed to store adequate water. According to a conservative estimate about 30 million acres feet of water was being wasted into the sea because the country had no big water reservoirs to store it.

More importantly, as a result of melting of glaciers due to global warming, a sword of Damocles remains hanging over our heads in the shape of floods.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed for this article.