AIRLINK 81.10 Increased By ▲ 2.55 (3.25%)
BOP 4.82 Increased By ▲ 0.05 (1.05%)
CNERGY 4.09 Decreased By ▼ -0.07 (-1.68%)
DFML 37.98 Decreased By ▼ -1.31 (-3.33%)
DGKC 93.00 Decreased By ▼ -2.65 (-2.77%)
FCCL 23.84 Decreased By ▼ -0.32 (-1.32%)
FFBL 32.00 Decreased By ▼ -0.77 (-2.35%)
FFL 9.24 Decreased By ▼ -0.13 (-1.39%)
GGL 10.06 Decreased By ▼ -0.09 (-0.89%)
HASCOL 6.65 Increased By ▲ 0.11 (1.68%)
HBL 113.00 Increased By ▲ 3.50 (3.2%)
HUBC 145.70 Increased By ▲ 0.69 (0.48%)
HUMNL 10.54 Decreased By ▼ -0.19 (-1.77%)
KEL 4.62 Decreased By ▼ -0.11 (-2.33%)
KOSM 4.12 Decreased By ▼ -0.14 (-3.29%)
MLCF 38.25 Decreased By ▼ -1.15 (-2.92%)
OGDC 131.70 Increased By ▲ 2.45 (1.9%)
PAEL 24.89 Decreased By ▼ -0.98 (-3.79%)
PIBTL 6.25 Decreased By ▼ -0.09 (-1.42%)
PPL 120.00 Decreased By ▼ -2.70 (-2.2%)
PRL 23.90 Decreased By ▼ -0.45 (-1.85%)
PTC 12.10 Decreased By ▼ -0.89 (-6.85%)
SEARL 59.95 Decreased By ▼ -1.23 (-2.01%)
SNGP 65.50 Increased By ▲ 0.30 (0.46%)
SSGC 10.15 Increased By ▲ 0.26 (2.63%)
TELE 7.85 Decreased By ▼ -0.01 (-0.13%)
TPLP 9.87 Increased By ▲ 0.02 (0.2%)
TRG 64.45 Decreased By ▼ -0.05 (-0.08%)
UNITY 26.90 Decreased By ▼ -0.09 (-0.33%)
WTL 1.33 Increased By ▲ 0.01 (0.76%)
BR100 8,052 Increased By 75.9 (0.95%)
BR30 25,581 Decreased By -21.4 (-0.08%)
KSE100 76,707 Increased By 498.6 (0.65%)
KSE30 24,698 Increased By 260.2 (1.06%)

Federal Minister for Railways Ghaus Bukhsh Mehar has said that Khanewal-Lodhran track will be doubled by December 2005 instead of June 2006, and afterwards work on Khanewal-Lahore and onwards track would be started.
He was speaking while presiding over a high-ranking meeting here on Saturday which discussed doubling of railway track and its overall situation. Chairman Railways Khurshid Ahmad Khan, General Manager Aurangzeb Khan and other officers attended the meeting.
The minister said that Railways needed Rs 500,000 to Rs 600,000 per kilometer per annum for looking after the railway tracks but the past governments neglected this aspect which resulted in deterioration of engines, wagons and coaches.
He, however, was appreciative of the Musharraf regime for giving attention to this sector and said that railway requirements should be met to make it a profitable organisation.
CHINESE COACHES: Regarding uplift works, he said that Chinese coaches have started arriving in Pakistan in CKD form, and are being assembled in Islamabad Carriage Factory, of which three coaches have been put in service.
The first consignment of goods wagons would be reaching next month, he added.
Speaking about future plans, Ghaus Bukhsh Mehar said that practical shape was being given to the project for laying of railway track up to Kandahar (Afghanistan), and after that, track would be laid from Kandahar to Turkmenistan.

Copyright Business Recorder, 2004

Comments

Comments are closed.