AIRLINK 72.59 Increased By ▲ 3.39 (4.9%)
BOP 4.99 Increased By ▲ 0.09 (1.84%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.71 Increased By ▲ 0.46 (1.47%)
DGKC 80.90 Increased By ▲ 3.65 (4.72%)
FCCL 21.42 Increased By ▲ 1.42 (7.1%)
FFBL 35.19 Increased By ▲ 0.19 (0.54%)
FFL 9.33 Increased By ▲ 0.21 (2.3%)
GGL 9.82 Increased By ▲ 0.02 (0.2%)
HBL 112.40 Decreased By ▼ -0.36 (-0.32%)
HUBC 136.50 Increased By ▲ 3.46 (2.6%)
HUMNL 7.14 Increased By ▲ 0.19 (2.73%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.67 Increased By ▲ 1.07 (2.92%)
OGDC 137.75 Increased By ▲ 4.88 (3.67%)
PAEL 23.41 Increased By ▲ 0.77 (3.4%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.63 Increased By ▲ 0.17 (2.63%)
PPL 125.05 Increased By ▲ 8.75 (7.52%)
PRL 26.99 Increased By ▲ 1.09 (4.21%)
PTC 13.32 Increased By ▲ 0.24 (1.83%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 70.80 Increased By ▲ 3.20 (4.73%)
SSGC 10.54 No Change ▼ 0.00 (0%)
TELE 8.33 Increased By ▲ 0.05 (0.6%)
TPLP 10.95 Increased By ▲ 0.15 (1.39%)
TRG 60.60 Increased By ▲ 1.31 (2.21%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,566 Increased By 157.7 (2.13%)
BR30 24,786 Increased By 749.4 (3.12%)
KSE100 71,902 Increased By 1235.2 (1.75%)
KSE30 23,595 Increased By 371 (1.6%)

imageISLAMABAD: Capacity of the Adhi Field has significantly increased to produce gas, natural gas liquid (NGL), liquified petroleum gas (LPG) with the commencement of its third plant, official sources in Pakistan Petroleum Limited (PPL) said Thursday.

The newly inaugurated plant-III has the potential to produce 25mmscfd (million standard cubic feet per day) gas, 5,300bbld (billion barrels liquid per day) NGL, and 150 mtd (metric ton per day) LPG, they told APP.

Now, with inception of the Plant-III, Adhi Field's production capacity is standing at 75 mmscfd gas, 10,300bbld NGL and 290mtd LPG, the sources informed.

Adhi Field is a joint venture of PPL, Oil and Gas Development Company Limited (OGDCL) and Pakistan Oil fields Limited (POL).

Commenting on future activities, they said that PPL was conducting a new reservoir simulation study, adding that additional six to eight development wells would be required to enhance production of the field. "Wellhead compression and exploration of sub-thrust is planned in 2017," they added.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed.