AIRLINK 74.00 Decreased By ▼ -0.25 (-0.34%)
BOP 5.14 Increased By ▲ 0.09 (1.78%)
CNERGY 4.55 Increased By ▲ 0.13 (2.94%)
DFML 37.15 Increased By ▲ 1.31 (3.66%)
DGKC 89.90 Increased By ▲ 1.90 (2.16%)
FCCL 22.40 Increased By ▲ 0.20 (0.9%)
FFBL 33.03 Increased By ▲ 0.31 (0.95%)
FFL 9.75 Decreased By ▼ -0.04 (-0.41%)
GGL 10.75 Decreased By ▼ -0.05 (-0.46%)
HBL 115.50 Decreased By ▼ -0.40 (-0.35%)
HUBC 137.10 Increased By ▲ 1.26 (0.93%)
HUMNL 9.95 Increased By ▲ 0.11 (1.12%)
KEL 4.60 Decreased By ▼ -0.01 (-0.22%)
KOSM 4.83 Increased By ▲ 0.17 (3.65%)
MLCF 39.75 Decreased By ▼ -0.13 (-0.33%)
OGDC 138.20 Increased By ▲ 0.30 (0.22%)
PAEL 27.00 Increased By ▲ 0.57 (2.16%)
PIAA 24.24 Decreased By ▼ -2.04 (-7.76%)
PIBTL 6.74 Decreased By ▼ -0.02 (-0.3%)
PPL 123.62 Increased By ▲ 0.72 (0.59%)
PRL 27.40 Increased By ▲ 0.71 (2.66%)
PTC 13.90 Decreased By ▼ -0.10 (-0.71%)
SEARL 61.75 Increased By ▲ 3.05 (5.2%)
SNGP 70.15 Decreased By ▼ -0.25 (-0.36%)
SSGC 10.52 Increased By ▲ 0.16 (1.54%)
TELE 8.57 Increased By ▲ 0.01 (0.12%)
TPLP 11.10 Decreased By ▼ -0.28 (-2.46%)
TRG 64.02 Decreased By ▼ -0.21 (-0.33%)
UNITY 26.76 Increased By ▲ 0.71 (2.73%)
WTL 1.38 No Change ▼ 0.00 (0%)
BR100 7,874 Increased By 36.2 (0.46%)
BR30 25,596 Increased By 136 (0.53%)
KSE100 75,342 Increased By 411.7 (0.55%)
KSE30 24,214 Increased By 68.6 (0.28%)

imageISLAMABAD: Pakistan Railways has decided to conduct a fresh feasibility study for connecting Dera Ismail Khan with Quetta under Medium Term Development Framework (2020-25) of China-Pakistan Economic Corridor (CPEC).

According to official documents, the fresh input/Terms of Reference (TORs) are being prepared for implementation of the project.

The connectivity of Dera Ismail Khan with Quetta is a part of future Railways Development Plan. The proposed route, 538 Km in length will connect Quetta with DI Khan via Bostan and Zhob, the documents added.

Giving details of the route, it said, Quetta-Bostan was 33 Km, Bostan to Zhob via Muslim, Bagh-Qila Saif-Ullah 295 Km, Zhob-DI Khan 185 km and DI Khan-Kotla Jam (near Bhakkar) 25 Km.

It is pertinent to mention here that the feasibility study of the project was carried out during 2006-07. Linking this route will develop far flung areas of Khyber Pakhtunkhwa and Balochistan.

With the completion of this route the distance from Quetta to Peshawar will be reduced 670 km as compared to Main Line-I (from Quetta to Peshawar).

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed.