BR100 Increased By (0.3%)
BR30 Increased By (0.41%)
KSE100 Decreased By (-0.05%)
KSE30 Decreased By (-0.06%)
AGHA 7.47 Decreased By ▼ -0.09 (-1.19%)
BECO 5.15 Increased By ▲ 0.06 (1.18%)
BML 54.81 Decreased By ▼ -0.17 (-0.31%)
BOP 33.13 Increased By ▲ 0.15 (0.45%)
CNERGY 10.34 Increased By ▲ 0.24 (2.38%)
CSIL 5.14 Increased By ▲ 0.01 (0.19%)
FCCL 52.30 Increased By ▲ 1.05 (2.05%)
FFL 16.50 Increased By ▲ 0.32 (1.98%)
FNEL 1.22 Increased By ▲ 0.03 (2.52%)
KEL 7.21 Increased By ▲ 0.15 (2.12%)
KOSM 5.86 Increased By ▲ 0.32 (5.78%)
LOTCHEM 27.17 Decreased By ▼ -1.95 (-6.7%)
MLCF 90.30 Increased By ▲ 1.48 (1.67%)
NBP 196.90 Decreased By ▼ -0.59 (-0.3%)
NCPL 55.70 Increased By ▲ 0.68 (1.24%)
NPL 65.49 Increased By ▲ 0.61 (0.94%)
OGDC 313.78 Increased By ▲ 1.83 (0.59%)
PACE 10.40 Increased By ▲ 0.19 (1.86%)
PAEL 41.25 Increased By ▲ 0.26 (0.63%)
PIBTL 16.06 Increased By ▲ 0.10 (0.63%)
PPL 213.83 Increased By ▲ 1.17 (0.55%)
PRL 54.15 Increased By ▲ 1.61 (3.06%)
PTC 69.99 Increased By ▲ 0.91 (1.32%)
SSGC 25.16 Increased By ▲ 0.06 (0.24%)
TBL 9.56 Decreased By ▼ -0.06 (-0.62%)
TELE 8.37 Increased By ▲ 0.05 (0.6%)
TPL 18.20 Increased By ▲ 0.45 (2.54%)
TPLP 13.10 Decreased By ▼ -0.12 (-0.91%)
TREET 21.41 Decreased By ▼ -0.33 (-1.52%)
TRG 59.98 Increased By ▲ 3.09 (5.43%)

imageISLAMABAD: Pakistan Railways has decided to conduct a fresh feasibility study for connecting Dera Ismail Khan with Quetta under Medium Term Development Framework (2020-25) of China-Pakistan Economic Corridor (CPEC).

According to official documents, the fresh input/Terms of Reference (TORs) are being prepared for implementation of the project.

The connectivity of Dera Ismail Khan with Quetta is a part of future Railways Development Plan. The proposed route, 538 Km in length will connect Quetta with DI Khan via Bostan and Zhob, the documents added.

Giving details of the route, it said, Quetta-Bostan was 33 Km, Bostan to Zhob via Muslim, Bagh-Qila Saif-Ullah 295 Km, Zhob-DI Khan 185 km and DI Khan-Kotla Jam (near Bhakkar) 25 Km.

It is pertinent to mention here that the feasibility study of the project was carried out during 2006-07. Linking this route will develop far flung areas of Khyber Pakhtunkhwa and Balochistan.

With the completion of this route the distance from Quetta to Peshawar will be reduced 670 km as compared to Main Line-I (from Quetta to Peshawar).

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed for this article.