AIRLINK 72.59 Increased By ▲ 3.39 (4.9%)
BOP 4.99 Increased By ▲ 0.09 (1.84%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.71 Increased By ▲ 0.46 (1.47%)
DGKC 80.90 Increased By ▲ 3.65 (4.72%)
FCCL 21.42 Increased By ▲ 1.42 (7.1%)
FFBL 35.19 Increased By ▲ 0.19 (0.54%)
FFL 9.33 Increased By ▲ 0.21 (2.3%)
GGL 9.82 Increased By ▲ 0.02 (0.2%)
HBL 112.40 Decreased By ▼ -0.36 (-0.32%)
HUBC 136.50 Increased By ▲ 3.46 (2.6%)
HUMNL 7.14 Increased By ▲ 0.19 (2.73%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.67 Increased By ▲ 1.07 (2.92%)
OGDC 137.75 Increased By ▲ 4.88 (3.67%)
PAEL 23.41 Increased By ▲ 0.77 (3.4%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.63 Increased By ▲ 0.17 (2.63%)
PPL 125.05 Increased By ▲ 8.75 (7.52%)
PRL 26.99 Increased By ▲ 1.09 (4.21%)
PTC 13.32 Increased By ▲ 0.24 (1.83%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 70.80 Increased By ▲ 3.20 (4.73%)
SSGC 10.54 No Change ▼ 0.00 (0%)
TELE 8.33 Increased By ▲ 0.05 (0.6%)
TPLP 10.95 Increased By ▲ 0.15 (1.39%)
TRG 60.60 Increased By ▲ 1.31 (2.21%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,566 Increased By 157.7 (2.13%)
BR30 24,786 Increased By 749.4 (3.12%)
KSE100 71,902 Increased By 1235.2 (1.75%)
KSE30 23,595 Increased By 371 (1.6%)

imageISLAMABAD: Pakistan Railways has decided to conduct a fresh feasibility study for connecting Dera Ismail Khan with Quetta under Medium Term Development Framework (2020-25) of China-Pakistan Economic Corridor (CPEC).

According to official documents, the fresh input/Terms of Reference (TORs) are being prepared for implementation of the project.

The connectivity of Dera Ismail Khan with Quetta is a part of future Railways Development Plan. The proposed route, 538 Km in length will connect Quetta with DI Khan via Bostan and Zhob, the documents added.

Giving details of the route, it said, Quetta-Bostan was 33 Km, Bostan to Zhob via Muslim, Bagh-Qila Saif-Ullah 295 Km, Zhob-DI Khan 185 km and DI Khan-Kotla Jam (near Bhakkar) 25 Km.

It is pertinent to mention here that the feasibility study of the project was carried out during 2006-07. Linking this route will develop far flung areas of Khyber Pakhtunkhwa and Balochistan.

With the completion of this route the distance from Quetta to Peshawar will be reduced 670 km as compared to Main Line-I (from Quetta to Peshawar).

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed.