AIRLINK 70.50 Decreased By ▼ -2.56 (-3.5%)
BOP 4.97 Decreased By ▼ -0.12 (-2.36%)
CNERGY 4.31 Decreased By ▼ -0.06 (-1.37%)
DFML 31.30 Decreased By ▼ -1.15 (-3.54%)
DGKC 76.85 Increased By ▲ 1.36 (1.8%)
FCCL 19.70 Increased By ▲ 0.18 (0.92%)
FFBL 35.10 Decreased By ▼ -1.05 (-2.9%)
FFL 9.12 Decreased By ▼ -0.10 (-1.08%)
GGL 9.91 Increased By ▲ 0.06 (0.61%)
HBL 113.30 Decreased By ▼ -3.40 (-2.91%)
HUBC 133.01 Increased By ▲ 0.32 (0.24%)
HUMNL 6.97 Decreased By ▼ -0.13 (-1.83%)
KEL 4.35 Decreased By ▼ -0.06 (-1.36%)
KOSM 4.33 Decreased By ▼ -0.07 (-1.59%)
MLCF 36.55 Increased By ▲ 0.35 (0.97%)
OGDC 134.18 Increased By ▲ 0.68 (0.51%)
PAEL 22.44 Decreased By ▼ -0.16 (-0.71%)
PIAA 25.05 Decreased By ▼ -0.96 (-3.69%)
PIBTL 6.50 Decreased By ▼ -0.05 (-0.76%)
PPL 116.85 Increased By ▲ 1.54 (1.34%)
PRL 26.40 Decreased By ▼ -0.23 (-0.86%)
PTC 13.85 Decreased By ▼ -0.25 (-1.77%)
SEARL 52.70 Decreased By ▼ -0.75 (-1.4%)
SNGP 67.80 Increased By ▲ 0.55 (0.82%)
SSGC 10.59 Decreased By ▼ -0.11 (-1.03%)
TELE 8.52 Increased By ▲ 0.10 (1.19%)
TPLP 10.93 Increased By ▲ 0.18 (1.67%)
TRG 62.05 Decreased By ▼ -1.82 (-2.85%)
UNITY 25.15 Increased By ▲ 0.03 (0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,443 Decreased By -17.9 (-0.24%)
BR30 24,108 Decreased By -63.4 (-0.26%)
KSE100 71,089 Decreased By -13.3 (-0.02%)
KSE30 23,387 Decreased By -7.5 (-0.03%)

total-400DAVOS: Total said on Thursday it will restart its Elgin gas field in the UK North Sea within days or weeks, but it still requires the go-ahead from Britain's health and safety regulator.

 

The field was shut down in March last year following a gas leak that lasted over seven weeks and was caused by gas flowing into a well that had been capped earlier.

 

Total chief executive Christophe de Margerie said at the World Economic Forum in Davos the field would restart within days or weeks.

 

However, before production can resume, Britain's Health and Safety Executive (HSE) has to decide whether the field is safe to restart.

 

"HSE has received the safety case from Total and is considering it," a spokesman for HSE said.

 

Total previously said it expected to lose more than $300 million from lost production if Elgin did not restart in 2012.

 

The platform usually produces 3 percent of Britain's gas and is one of the deepest and most highly pressurised wells in the world.

 

It usually pumps 9 million cubic metres of gas daily and 60,000 barrels of light oil per day, according to Total.

Copyright Reuters, 2013

Comments

Comments are closed.