AIRLINK 81.10 Increased By ▲ 2.55 (3.25%)
BOP 4.82 Increased By ▲ 0.05 (1.05%)
CNERGY 4.09 Decreased By ▼ -0.07 (-1.68%)
DFML 37.98 Decreased By ▼ -1.31 (-3.33%)
DGKC 93.00 Decreased By ▼ -2.65 (-2.77%)
FCCL 23.84 Decreased By ▼ -0.32 (-1.32%)
FFBL 32.00 Decreased By ▼ -0.77 (-2.35%)
FFL 9.24 Decreased By ▼ -0.13 (-1.39%)
GGL 10.06 Decreased By ▼ -0.09 (-0.89%)
HASCOL 6.65 Increased By ▲ 0.11 (1.68%)
HBL 113.00 Increased By ▲ 3.50 (3.2%)
HUBC 145.70 Increased By ▲ 0.69 (0.48%)
HUMNL 10.54 Decreased By ▼ -0.19 (-1.77%)
KEL 4.62 Decreased By ▼ -0.11 (-2.33%)
KOSM 4.12 Decreased By ▼ -0.14 (-3.29%)
MLCF 38.25 Decreased By ▼ -1.15 (-2.92%)
OGDC 131.70 Increased By ▲ 2.45 (1.9%)
PAEL 24.89 Decreased By ▼ -0.98 (-3.79%)
PIBTL 6.25 Decreased By ▼ -0.09 (-1.42%)
PPL 120.00 Decreased By ▼ -2.70 (-2.2%)
PRL 23.90 Decreased By ▼ -0.45 (-1.85%)
PTC 12.10 Decreased By ▼ -0.89 (-6.85%)
SEARL 59.95 Decreased By ▼ -1.23 (-2.01%)
SNGP 65.50 Increased By ▲ 0.30 (0.46%)
SSGC 10.15 Increased By ▲ 0.26 (2.63%)
TELE 7.85 Decreased By ▼ -0.01 (-0.13%)
TPLP 9.87 Increased By ▲ 0.02 (0.2%)
TRG 64.45 Decreased By ▼ -0.05 (-0.08%)
UNITY 26.90 Decreased By ▼ -0.09 (-0.33%)
WTL 1.33 Increased By ▲ 0.01 (0.76%)
BR100 8,052 Increased By 75.9 (0.95%)
BR30 25,581 Decreased By -21.4 (-0.08%)
KSE100 76,707 Increased By 498.6 (0.65%)
KSE30 24,698 Increased By 260.2 (1.06%)

More than 39,000 smart meters have been installed successfully under USAID-funded AMI Project which has been implemented in Mepco and Pesco to cater to the small industrial, agricultural (tube wells), and public sector consumers. This project has launched to reduce distribution losses and modernise the electricity metering and billing operations. In Mepco, more than 39,000 smart meters have been installed so far.
These meters were installed in series with existing billing meters and automatically transfers the metering data via GSM/ GPRS communication medium to the server after specified time interval. Under a phase wise programme, the billing operations will be transferred to these AMR meters. One sub division has been effectively integrated with the billing system in order to eradicate any problem that might arise in the operations of the system. After successfully converting the billing of one sub division, the project is in the second phase to integrate other sub divisions with the billing system. A Pakistani company has implemented the complete solution comprising smart meters, IT infrastructure and software. Also, AMI Cell has been established at Mepco office with trained staff for smooth transferring and integration of the billing operations.

Copyright Business Recorder, 2015

Comments

Comments are closed.