AIRLINK 76.15 Increased By ▲ 1.75 (2.35%)
BOP 4.86 Decreased By ▼ -0.09 (-1.82%)
CNERGY 4.31 Decreased By ▼ -0.03 (-0.69%)
DFML 46.65 Increased By ▲ 1.92 (4.29%)
DGKC 89.25 Increased By ▲ 1.98 (2.27%)
FCCL 23.48 Increased By ▲ 0.58 (2.53%)
FFBL 33.36 Increased By ▲ 1.71 (5.4%)
FFL 9.35 Decreased By ▼ -0.01 (-0.11%)
GGL 10.10 No Change ▼ 0.00 (0%)
HASCOL 6.66 Decreased By ▼ -0.11 (-1.62%)
HBL 113.77 Increased By ▲ 0.17 (0.15%)
HUBC 143.90 Increased By ▲ 3.75 (2.68%)
HUMNL 11.85 Decreased By ▼ -0.06 (-0.5%)
KEL 4.99 Increased By ▲ 0.12 (2.46%)
KOSM 4.40 No Change ▼ 0.00 (0%)
MLCF 38.50 Increased By ▲ 0.10 (0.26%)
OGDC 133.70 Increased By ▲ 0.90 (0.68%)
PAEL 25.39 Increased By ▲ 0.94 (3.84%)
PIBTL 6.75 Increased By ▲ 0.22 (3.37%)
PPL 120.01 Increased By ▲ 0.37 (0.31%)
PRL 26.16 Increased By ▲ 0.28 (1.08%)
PTC 13.89 Increased By ▲ 0.14 (1.02%)
SEARL 57.50 Increased By ▲ 0.25 (0.44%)
SNGP 66.30 Decreased By ▼ -0.10 (-0.15%)
SSGC 10.10 Decreased By ▼ -0.05 (-0.49%)
TELE 8.10 Increased By ▲ 0.15 (1.89%)
TPLP 10.61 Decreased By ▼ -0.03 (-0.28%)
TRG 62.80 Increased By ▲ 1.14 (1.85%)
UNITY 26.95 Increased By ▲ 0.32 (1.2%)
WTL 1.34 Decreased By ▼ -0.02 (-1.47%)
BR100 7,957 Increased By 122.2 (1.56%)
BR30 25,700 Increased By 369.8 (1.46%)
KSE100 75,878 Increased By 1000.4 (1.34%)
KSE30 24,343 Increased By 355.2 (1.48%)

More than 39,000 smart meters have been installed successfully under USAID-funded AMI Project which has been implemented in Mepco and Pesco to cater to the small industrial, agricultural (tube wells), and public sector consumers. This project has launched to reduce distribution losses and modernise the electricity metering and billing operations. In Mepco, more than 39,000 smart meters have been installed so far.
These meters were installed in series with existing billing meters and automatically transfers the metering data via GSM/ GPRS communication medium to the server after specified time interval. Under a phase wise programme, the billing operations will be transferred to these AMR meters. One sub division has been effectively integrated with the billing system in order to eradicate any problem that might arise in the operations of the system. After successfully converting the billing of one sub division, the project is in the second phase to integrate other sub divisions with the billing system. A Pakistani company has implemented the complete solution comprising smart meters, IT infrastructure and software. Also, AMI Cell has been established at Mepco office with trained staff for smooth transferring and integration of the billing operations.

Copyright Business Recorder, 2015

Comments

Comments are closed.