AIRLINK 81.10 Increased By ▲ 2.55 (3.25%)
BOP 4.82 Increased By ▲ 0.05 (1.05%)
CNERGY 4.09 Decreased By ▼ -0.07 (-1.68%)
DFML 37.98 Decreased By ▼ -1.31 (-3.33%)
DGKC 93.00 Decreased By ▼ -2.65 (-2.77%)
FCCL 23.84 Decreased By ▼ -0.32 (-1.32%)
FFBL 32.00 Decreased By ▼ -0.77 (-2.35%)
FFL 9.24 Decreased By ▼ -0.13 (-1.39%)
GGL 10.06 Decreased By ▼ -0.09 (-0.89%)
HASCOL 6.65 Increased By ▲ 0.11 (1.68%)
HBL 113.00 Increased By ▲ 3.50 (3.2%)
HUBC 145.70 Increased By ▲ 0.69 (0.48%)
HUMNL 10.54 Decreased By ▼ -0.19 (-1.77%)
KEL 4.62 Decreased By ▼ -0.11 (-2.33%)
KOSM 4.12 Decreased By ▼ -0.14 (-3.29%)
MLCF 38.25 Decreased By ▼ -1.15 (-2.92%)
OGDC 131.70 Increased By ▲ 2.45 (1.9%)
PAEL 24.89 Decreased By ▼ -0.98 (-3.79%)
PIBTL 6.25 Decreased By ▼ -0.09 (-1.42%)
PPL 120.00 Decreased By ▼ -2.70 (-2.2%)
PRL 23.90 Decreased By ▼ -0.45 (-1.85%)
PTC 12.10 Decreased By ▼ -0.89 (-6.85%)
SEARL 59.95 Decreased By ▼ -1.23 (-2.01%)
SNGP 65.50 Increased By ▲ 0.30 (0.46%)
SSGC 10.15 Increased By ▲ 0.26 (2.63%)
TELE 7.85 Decreased By ▼ -0.01 (-0.13%)
TPLP 9.87 Increased By ▲ 0.02 (0.2%)
TRG 64.45 Decreased By ▼ -0.05 (-0.08%)
UNITY 26.90 Decreased By ▼ -0.09 (-0.33%)
WTL 1.33 Increased By ▲ 0.01 (0.76%)
BR100 8,052 Increased By 75.9 (0.95%)
BR30 25,581 Decreased By -21.4 (-0.08%)
KSE100 76,707 Increased By 498.6 (0.65%)
KSE30 24,698 Increased By 260.2 (1.06%)

LAHORE: The 969 MW Neelum Jhelum hydropower plant was shutdown the other day for physical inspection of its head race tunnel to locate the problem, which led to decrease in pressure a month ago. Once the problem is traced, a comprehensive plan will be chalked out in coordination with the project consultants and the international experts for undertaking remedial works to rectify the issue.

According to the details, a sudden change in the head race tunnel pressure was observed on April 2, 2024. As per the advice of the project consultants for safety of head race tunnel, the project management kept operating the plant at a restricted generation of 530 MW since April 6 to monitor fluctuation in the head race tunnel pressure.

Neelum Jhelum hydropower plant continued generating about 530 MW electricity until April 29 without any issue. However, at 2257 hours on April 29, further change in the head race tunnel pressure was observed.

Subsequently, the generation was gradually reduced, but the pressure could not sustain within the safe limits as per the advice of the project consultants. Keeping in view the safety of the head race tunnel and the power house, the plant was shutdown at 0600 hours on May 1 for physical inspection of the head race tunnel to identify the problem of reduced pressure.

Copyright Business Recorder, 2024

Comments

Comments are closed.